My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All service lines 8 inches and larger shall require the construction of a manhole for <br />connections to the mainline. 4 -inch and 6 -inch blind connections are acceptable. 8 -inch <br />and larger blind connections are acceptable where the mainline diameter is twice the <br />diameter of the service lateral or greater. <br />A cleanout is required at the right of way, per Standard Drawing RD -310, on all 6 -inch <br />service lines. Each 4 -inch service outside of the right-of-way shall have a private easement <br />if crossing an adjoining property. Use of inside drops are to be minimized, limited only to <br />situations when public wastewater is very deep, in areas of known high ground water, or <br />if dense rock is encountered. <br />Tops of service line pipes shall be 4 feet to 6 feet below finished grade at the property <br />line in accordance with the Standard Drawings. <br />Public Improvement Design Standards Manual, 2016 Page 2-50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.