Laserfiche WebLink
<br />Accessible “Ready” Number of Units/ Average Square Feet Proposed Estimated <br />Units Bedrooms per Unit Rental Rate or Sale <br />Price <br /> <br /> <br /> <br /> <br />Type/description of construction and materials. <br /> <br /> <br /> <br /> <br /> <br />Describe any additional public utility needs. <br /> <br /> <br /> <br />Describe proposed landscaping. <br /> <br /> <br /> <br /> <br /> <br />Please attach the following to your application: <br /> <br />PRO-FORMA. <br />1. Detailed construction and operating cost analysis demonstrating project’s <br />“need” for tax exemption, and that the project could not be built “but for” the tax <br />exemption. This analysis or pro-forma should show the rental rates of each type of unit <br />both with and without the tax exemption. <br /> <br />FINANCIAL FEASIBILITY. <br />2. Information on the property costs and financing for the <br />housing which demonstrates the financial feasibility of the project. <br /> <br />SITE PLAN. <br />3. A site plan and supporting maps, drawn to a minimum scale of one inch <br />equals 16 feet, which shows in detail the development plan of the entire project, including <br />a side and front elevation, showing streets, driveways, sidewalks, pedestrian ways, off- <br />street parking, and loading areas; location and dimension of structures; use of land and <br />structure; major landscaping features; design of structures; existing and proposed utility <br />systems including sanitary sewers; storm sewers, water, electric, gas, and telephone <br />lines. <br /> <br />PUBLIC/PRIVATE ACCESS. <br />4. Description and map or diagram of public and private <br />access to property and parking, and circulation plans for project. <br /> <br />Please provide above drawings on 8-1/2” X 11” size paper for reproduction purposes. An <br />alternative is an electronic PDF version that can be easily printed. The applicant is <br />encouraged to provide, in addition to the above, any additional materials, such as <br />economic feasibility status or market analysis appropriate to the project. <br /> <br />PROPOSED ELIMINATION OF EXISTING STRUCTURES. <br />5. Explanation and justification <br />for any proposed elimination of existing, sound and rehabitable housing on the site. <br />