Laserfiche WebLink
1.4 Prominent entry facing the public street; <br /> <br />1.5 Number of units by which the minimum density is exceeded or the percent <br />of housing units having three or more bedrooms (to encourage families); <br /> <br />1.6 Number of available ADA accessible units that exceed the required <br />standard; <br /> <br />1.7 Responsiveness to neighborhood character and safety in respect to height, <br />mass, architectural detail, landscaping and open space; <br /> <br />1.8 Number of units designed for home ownership; and <br /> <br />1.9 Solicitation of comments from the relevant neighborhood association. <br /> <br /> 2. Compliance with Local Law. <br /> The proposed project must be, at the time of <br />completion of construction, in conformance with all local plans and planning regulations which <br />are applicable at the time the application is approved. <br /> <br />3. Local Standards. <br /> The proposed project must comply with the following <br />additional standards: <br /> <br /> of the Proposed Project Site. <br /> 3.1 Utilization <br /> <br /> of Historic Structure or Potential Historic Structure <br />3.1.1 Removal. <br />No exemption shall be granted for any property where an historic structure or <br />potential historic structure has been demolished or removed from the property <br />within the two years immediately preceding the date of application for the <br />exemption. This restriction shall be waived if the owner of the property gave <br />notice of the intent to demolish or move the structure to the Eugene Historic <br />Review Board at least 60 days before the owner's application for a demolition or <br />moving permit from the City. <br /> <br /> Justification for Elimination of Existing Housing. <br />3.1.2 No exemption <br />shall be granted for any property on which any housing unit has been demolished <br />or removed from the property within the two years immediately preceding the <br />date of application for the exemption. This restriction shall be waived if the <br />proposed project increases the number of dwelling units by 50% from what <br />previously existed or if it replaces the old dwelling units by significantly larger <br />dwelling units that will accommodate families. <br /> <br />4. Public Benefit Beyond the Period of Exemption. <br /> The owner must demonstrate <br />that one or more of the public benefits described in the application will extend beyond the period <br />of the tax exemption. <br /> <br />5. Project Would Not be Built Without Exemption. <br /> The owner must <br />demonstrate that construction of the housing would not be financially feasible without the benefit <br />of the tax exemption. <br /> <br />