<br />ECC <br />UGENE ITY OUNCIL <br />AIS <br />GENDA TEM UMMARY <br /> <br /> <br /> <br /> <br />Work Session: Update on EWEB Roosevelt Operations Center <br /> <br /> <br />Meeting Date: February 13, 2008 Agenda Item Number: B <br />Department: Central Services Staff Contact: Sue Cutsogeorge <br />www.eugene-or.gov Contact Telephone Number: 682-5589 <br /> <br /> <br /> <br /> <br />ISSUE STATEMENT <br /> <br />On February 25, 2008, EWEB plans to request authorization to issue Electric Utility System Revenue <br />Bonds in the amount of $85.5 million for design and construction work associated with relocation of <br />EWEB water and electric utility operations and engineering related functions to a new site in west <br />Eugene. This work session will provide an update on the status of the project and background for the <br />February 25 request for financing authorization. No action is requested at this meeting. <br /> <br /> <br />BACKGROUND <br /> <br />In February 2006, the EWEB Board of Commissioners authorized relocation of the utility’s water and <br />electric engineering and operations functions currently located downtown to a new site at Roosevelt <br />Boulevard and Beltline Road. Customer Service and certain administrative functions will remain <br />downtown in the existing headquarters building. This decision followed a consensus board agreement <br />that most of the existing downtown operations facilities have outlived their useful life and need to be <br />replaced, and that long-term use of the riverfront site for EWEB water and electric operations, and <br />equipment storage functions, was not in the best interest of the utility or the community. <br /> <br />In April 2006, the board authorized issuance of $8 million in electric system revenue bonds under <br />provisions of the Uniform Revenue Bond Act to help finance design and development work related to <br />the relocation. In May 2006, the council approved that authorization. <br /> <br />In July 2006, EWEB started final design of the new facilities. In February 2007, after detailed review, <br />the board agreed the project cost estimate ($98 million) was too high and directed staff to reduce the <br />scope and cost for the new facilities. In July 2007, after several months of review, including a space and <br />cost reduction of approximately 15 percent and a third-party project review completed by several local <br />contractors, the board approved a revised project budget of $83.5 million and authorized staff to proceed <br />with the design and preparation of a cost estimate to use in project financing in early 2008. <br /> <br />The “Roosevelt Operations Center Schematic Design Executive Summary” is attached (Attachment A). <br />This document provides a detailed description of the project, program and space requirements, estimated <br />costs, a review of proposed sustainability measures, and plans of the site and proposed buildings. <br /> <br /> <br /> <br /> F:\CMO\2008 Council Agendas\M080213\S080213B.doc <br />