My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on Oregon West Management
COE
>
City of Eugene
>
Council Agendas 2008
>
CC Agenda - 02/19/08 Public Hearing
>
Item 1: Ordinance on Oregon West Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:18:00 PM
Creation date
2/15/2008 11:03:25 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/19/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Two-\Vay Stop Control <br /> <br />Page 1 of 1 <br />'-' <br /> <br /> TWO-WAY STOP CONTROL SUMMARY <br />General Information Site Information <br />Analvst CindY Pulone Intersection <br />Aaenev/Co. Branch Engineerina Uurisdiction City of Eugene <br />Date Performed 8/24/2007 Analvsis Year 2008 'BUild' Proposed <br />Analvsis Time Period oM Peak Hour <br />Protect Description Santa Clara schoof site redeveJoDment <br />EastlWest Street: Green Lane INorth/South Street River Road <br />Intersection Orientation: North-South IStudY Period 7hrs ~ 0.25 <br />'Vehicle Volumes and Adiustments I <br />MaioI' Street Northbound Southbound <br />Movement 1 2 3 4 5 6 <br /> L T R L T R <br />Volume (veh/h} 9 1484 45 11 1194 9 <br />Peak-Hour Factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 <br />Hourly Flow Rate, HFR 9 1529 46 11 1230 9 <br />(veh/h) <br />Percent Heavy Vehicles 0 -- -- 0 - - <br />Median Type Two Way Left Turn Lane <br />RT Channelized 0 0 <br />Lanes 1 2 0 1 2 0 <br />Configuration L T TR L T TR <br />Jostream Siana! 0 0 <br />Minor Street Eastbound Westbound <br />Movement 7 8 9 10 11 12 <br /> L T R L T R <br />Volume iveh!h) 4 0 17 68 0 30 <br />Peak-Hour Factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 <br />Hourly Flow Rate, HFR 4 0 17 70 0 30 <br />veh/h) <br />Percent Heavy Vehicles 0 0 0 0 0 0 <br />Percent Grade (%) 0 0 <br />1,..., N - N <br />tared Approach <br />Storage 0 0 <br />RT Channelized 0 0 <br />anes 0 1 0 0 1 0 <br />Configuration LTR LTR ~ <br /> - - <br />Delav, Queue Length, and level of Service <br />ti,pproach Northbound Southbound Westbound Eastbound <br />Movement 1 4 7 8 9 10 11 12 <br />Lane Configuration L L LiR LTR <br />v (veh/h) 9 11 100 21 <br />~Ji}1) (veh/h) 565 420 132 312 <br />vie 0.02 0.03 0.76 0.07 <br />195% queue length 0.05 0.08 4.44 0.22 <br />!control Delay (s/veh) 11.5 13.8 88.5 17.4 <br />LOS Q B F I C <br />'-' <br />.L\pproach Delay (s!veh) -- -- 88.5 17.4 <br />Approach LOS -- -- F C <br /> <br />Copyright @ 2005 University of Fiorida. All Rights Reserved <br /> <br />HCS+ ™ Version 5.21 <br /> <br />Generated: 812412007 2:28 PM <br /> <br />fl1e:!IC:\Documents (md Settings\cindyp\Local Settings\Temp\u2kl BD.tmp <br /> <br />8/24/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.