My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on Oregon West Management
COE
>
City of Eugene
>
Council Agendas 2008
>
CC Agenda - 02/19/08 Public Hearing
>
Item 1: Ordinance on Oregon West Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:18:00 PM
Creation date
2/15/2008 11:03:25 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/19/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Two-Way Stop Control <br /> <br />Paue I of 1 <br />~ <br /> <br /> TWO-WAY STOP CONTROL SUMMARY <br />General Information :)ite Information <br />nalyst Cindy Pu/one Intersection <br />\qencv/Co. Branch Enoineering Jurisdiction City of Eugene <br />)ate Performed 6/29/2007 Analysis Year 2022 'Build' Proposed <br />Analysis Time Period PM Peak Hour <br />Project Descriotion Santa Clara school site redevelopment <br />EastlWest Street: Hunsaker Lane lNorth/South Street: Site Access <br />Intersection Orientation: East-West IStudy Period (hrs): 0.25 <br />Vehicle Volumes and Adjustments <br />Major Street Eastbound Westbound <br />Movement 1 2 3 4 5 6 <br /> L T R L T R <br />Volume (veh/h) 150 55 20 970 <br />Peak-Hour Factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 <br />lHourly Flow Rate, HFR 0 154 56 20 999 0 <br />veh/h) I <br />Percent Heavy Vehicles 0 - - 0 - - <br />Median Type Undivided <br />RT Channelized 0 0 <br />lanes 0 1. 0 0 1 0 <br />ConfiQ uration TR LT <br />Upstream Stonel 0 0 <br />Minor Street Northbound Southbound <br />Movement 7 8 9 10 11 12 <br /> L T R L T R <br />VOlume (veh!h} 65 25 <br />Peak-Hour Factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 <br />Hourly Flow Rate, HFR 67 0 25 0 0 0 <br />(veh!h) <br />Percent Heavy Vehicles 0 0 0 0 0 0 <br />Percent Grade (%) 0 0 <br />Flared Approach N N <br />Storage 0 0 <br />R I Channelized 0 0 <br />Lanes 1 0 1 0 0 0 <br />Confiquration L R <br /> --. <br />Delay, Queue LenQth, and Level of Service <br />Approach Eastbound Westbound Northbound Southbound <br />fv10vement 1 4 7 8 9 10 11 12 I <br /> i <br />Lane Configuration LT L R <br />v (veh/h) 20 67 25 I <br />C (m} (veh/h) 1361 193 848 <br />vie 0.01 0.35 0.03 <br />95% queue length 0.04 1.46 0.09 <br />Control Delay (s/veh) 7.7 33.3 9.4 <br />LOS A D .4 <br />ApprDach Delay (s/veh) - -- 26.8 <br />Approach LOS -- -- D I <br /> -.. <br /> <br />Copyright @ 2005 University of Florida. Ali Rights Reserved <br /> <br />HCS+ ™ Version 5.21 <br /> <br />Generated: 8/24:2007 4: 17 PIJ. <br /> <br />file:!!C:\Documents and Settings\cindyp\Local Settings\Temp\u2k228.tmp <br /> <br />8/24/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.