My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes - 01/16/08 Joint Elected Officials
COE
>
City of Eugene
>
Council Minutes
>
2008
>
CC Minutes - 01/16/08 Joint Elected Officials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:27:52 AM
Creation date
2/21/2008 2:16:43 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Joint Elected Officials
CMO_Meeting_Date
1/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
With regard to traffic, Howe indicated the County engineer waived the requirement for a traffic impact <br />analysis. He noted it is an existing site and the existing processing operation is not going to change. He <br />said all that is happening is that it is expanding the area from which they are taking the gravel. He <br />explained because of the scale and size of the proposed extraction rate in the expansion area, it didn’t <br />warrant a detailed traffic analysis for road performance. He indicated that the County found that they <br />did not require further analysis and traffic impacts had been minimized. <br /> <br />With regard to groundwater, Howe reported that the construction of the aquaclude is proposed to <br />minimize any loss of groundwater and any impact to neighboring wells. He said it is a low grade barrier <br />that would eliminate flow on the groundwater into the pit. He said groundwater by the Board of <br />Commissioners has been determined to be minimized with the aquaclude. <br /> <br />Under wetlands, Howe noted the Division of State Lands is the regulatory body. He indicated there are <br />two identified wetlands on the property and the completion of the aquaclude would function to retain <br />groundwater that could also retain water in the lower reaches of the wetlands and it wouldn’t impact the <br />wetlands. He indicated the Board of Commissioners has concluded that the impacts to wetlands have <br />been minimized. <br /> <br />With regard to flooding, Howe stated that FEMA is the agency standard. He added that gravel <br />extraction doesn’t impede the water flow. He said the extraction of the aggregate proceeds in a <br />downward manner and doesn’t create any barriers that impede flood flows. He indicated under this <br />analysis, the Board concluded that the potential impact of flooding has been minimized by meeting the <br />FEMA regulations. <br /> <br />Under agricultural conflicts, Howe reported that there are two standards under the state rule, <br />Agricultural Land Goal 3. He said the proposal won’t force a significant change in accepted farm or <br />forest practices and won’t significantly increase the cost of accepted farm or forest practices on <br />surrounding lands. He said the property is currently being farmed and the land being farmed is an <br />appropriate interim use for future gravel resource. He said the agricultural uses that have been identified <br />in the record are beyond the 1500 foot impact area. He stated no minimization conditions are proposed <br />and the agricultural conflicts have been met. <br /> <br />With regard to notice, Howe noted the category is addressed by the regulations of the DEQ. He said <br />under Goal 5, only the expansion area is subject to the noise threshold requirement. He indicated that <br />there is an existing operation. He added that the plant and processing faculties are currently operating <br />under a permit. He added that the focus on noise conflicts with the final analysis, the minimization <br />procedures and the conditions and findings provided were sufficient evidence for the Board to conclude <br />that potential noise conflicts of mining the expansion area are minimized to the level required under the <br />Goal 5 Rule by meeting the noise standards. <br /> <br />Under dust, Howe stated the DEQ regulates the dust emission standards through LRAPA through an air <br />contaminate discharge permit. He indicated that Delta’s processing operation directly east of the <br />expansion site operates under the current LRAPA permit and if approved the future mining expansion <br />area would be added to the existing permit that would be updated to include the expansion area and <br />conduct operations in a manner with the applicable standards under the existing authorized permit. He <br />indicated that the sources of dust include activities from overburden removal, aggregate extraction and <br />truck traffic on the haul roads from the expansion area to the processing plant on the existing approved <br />operation. He said the Board found that the potential dust conflicts would be minimized to the <br /> <br />3 <br />MINUTES—Eugene City Council January 16, 2008 Page <br /> Joint Elected Officials Meeting <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.