My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20335
COE
>
City of Eugene
>
Ordinances
>
2005 No. 20333-20356
>
Ordinance No. 20335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:31 PM
Creation date
1/27/2005 11:03:15 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
1/24/2005
Document_Number
20335
CMO_Effective_Date
1/26/2005
Author
Mayor Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hearing Memo - Santa Clara Avenue <br />January 5, 2005 <br />Page 2 <br /> <br />The non-assessable City share for this project will be funded from the Transportation SDC Fund, <br />Stormwater SDC Fund, and Transportation Utility Fund (for a small section of pavement repair). <br /> <br />Assessment financing, a 10-year payment plan through the City, is available to all property owners <br />within the improvement district as identified by City Code, Chapter 7. None of the property owners <br />qualify for the low-to moderate income subsidy program. <br /> <br />Below are the final unit assessable costs: <br /> <br />Sidewalk (per square foot) <br />Curbs and Gutters (per front foot) <br /> <br />$ 7.56 <br />$ 54.08 <br /> <br />Direct Charges assessed <br />Total Assessable Cost <br />Total City Cost <br />Total Project Cost <br /> <br />$ 36,013.45 <br />$115,188.80 <br />$ 5,525.27 <br />$120,714.07 <br /> <br />The City will pick up the cost for non-assessable curb and gutter, sidewalks, and storm drainage <br />system as identified by City Code, Chapter 7. <br /> <br />Costs listed below are the estimated assessment costs calculated at the time' of the formation of the <br />LID. A contingency was included in the es~mate. <br /> <br />Sidewalks (per square foot) <br />Curbs and Gutters (per front foot) <br /> <br />$ 8.31 <br />$ 58.61 <br /> <br />Total Assessable COst <br />Total City Cost <br />Direct Charges <br />Total Project Cost <br /> <br />$129,166.10 <br />$ 16,010.66 <br />$ 42,706.00 <br />$145,176.76 <br /> <br />RECOMMENDATION <br /> <br />The final total assessable costs are lower than quoted at the time of the formation of the LID. Costs <br />are distributed in accordance with Eugene Code. Staff recommends approval of the assessments as <br />calculated and that the Council levy the final assessments. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.