My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20335
COE
>
City of Eugene
>
Ordinances
>
2005 No. 20333-20356
>
Ordinance No. 20335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:31 PM
Creation date
1/27/2005 11:03:15 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
1/24/2005
Document_Number
20335
CMO_Effective_Date
1/26/2005
Author
Mayor Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> <br />FINDINGS AND RECOMMENDATIONS <br /> <br />SUBJECT: PROPOSED FINAL ASSESSMENT FOR CONSTRUCTION OF <br /> SIDEWALKS, cURBs, GUTTERS, AND STORM DRAINAGE SYSTEM ON <br /> SANTA CLARA AVENUE FROM RIVER ROAD TO APPROXIMATELY 600 <br /> FEET. WEST (JOB 4108) (CONTRACT 2005-10) <br /> <br />BACKGROUND <br /> <br />Santa Clara Avenue runs west from River Road between B01tlin~ and Irving Road: Prior to this <br />project Santa Clara Avenue was paved, but not completely developed to City Stafidards. The area <br />around Santa-Clara Avenue continues to develop. St. Vincent de Paul is cons.tmcting a 60 unit <br />low income residential development on Santa Clara Avenue, just west of the. area to be <br />improved. TheCity of Eugene's Fire Station #11 is under construction along the'Portion of <br />Santa Clara Avenue included in this project. In 2003, Lane Cour~ty finished street improvements <br />to the portion of Santa Clara Avenue just west of the Local Improvement District. <br /> <br />The City of Eugene received irrevocable petitions for this project in September and October <br />1989. The petitions included an area representing more than 81 percent of the assessable area of <br />the Local ImprOvement District. After the County finished their improvemen~ to Santa.Clara <br />Avenue, and in light.of the ongoing developments in the area, the Eugene City Engineer initiated <br />'Preparation of plans and bid specifications on February 20, 2004. Bids were solicited and the <br />Council acted to form the Local Improvement District (IJD) on August 12, 2004. The project <br />· has been completed, and final assessment costs have been calculated. The property owners were <br />notified of the pending assessment hearing ten (10) days prior to the date of th.e scheduled <br />hearing. <br /> <br />PROJECT <br /> <br />The project brings this portion of Santa Clara Avenue up to city .standards~ The improvements are <br />designed to meet the current and future pedestrian, bicycle and vehicular trave! needs along Santa <br />Clara Avenue. The improvements include constructing curbs, gutters sidewalks and storm <br />drainage on the north and south sides of Santa 'Clara from River Road to 600 feet west. <br /> <br />'ASSESSMENTS <br /> <br />Chapter 7 of the Eugene Code provides that the cost of~ublic improvement projects such as the <br />improvements to Santa Clara Avenue should be spread among the benefiting property owners, <br />with the City of Eugene absorbing a share of the costs. The City's share of costs includes costs <br />that the City has decided are necessary, but which do not provid~ as large and direct a benefit as <br />other costs which are assessed to property owners. <br /> <br />PROPOSED FINAL ASSESSMENT FOR CURBS AND GUTTERS, SIDEWALKS, AND STORM DRAINAGE <br />ON SANTA CLARA AVENUE Page 1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.