Laserfiche WebLink
<br />• Traditional attic roof construction for gravity ventilation of heat build-up, hip roof eaves for shade. <br /> <br />• Glazing area for excellent day lighting; south and west windows for solar insulation in winter <br /> months; highly efficient insulation and weatherization. <br /> <br />• Time clock and occupancy sensors in parking area to control efficient fluorescent light. Photocell <br /> exterior lights at common areas. Metered utilities for each unit. <br /> <br />• Majority of parking under living units reduces “heat island” effect. <br /> <br />• Construction waste kept to minimum and recycled. Convenient tenant recycling area. <br /> <br />• Architectural interest and contextual compatibility in building design. Larger interior yard set <br /> backs maintained. Primary residence renovation to maintain current streetscape appearance. <br /> <br />• Cabinets, doors, and trim prefinished offsite; more operable window area than required by code to <br /> enhance indoor air quality; exhaust fans with timers to reduce moisture problems. <br /> <br />• Washers and dryers included in units reduce travel to laundromats. <br /> <br />• Landscaping with plants selected for low water usage, ease of maintenance and aesthetic <br /> considerations, including many native plants, on all sides of building. <br /> <br />Responsiveness to adjacent historic structures. There are no adjacent historic structures. However, one <br />house on front of the lot will be retained and the overall form of the building will honor neighboring <br />residential structures. <br /> <br />Use of higher quality materials that contribute to longevity: The Fenway will use high quality, 40-year <br />plus rated roof shingles; Hardi brand cementitious exterior siding; vinyl windows; concrete parking area. <br />A 100-year or longer life is anticipated for the building. <br /> <br />th <br />Prominent entry facing the public street: The existing house facing East 14 Street is being retained. <br />All entrances of new building will be at grade level on the west side for security and fire safety. <br /> <br />Impact and Need for Tax Exemptions to Encourage Housing <br />The City and other local taxing districts forgo some revenue when a development is exempt from taxes. <br />The land itself continues to be taxed during the exemption period. This project proposes new <br />construction on a property that has a full-size house in the front and a small building in back that was <br />likely a garage at one time but is in substandard condition and has minimal value. The front house will <br />remain and be rehabilitated. The back of the property is currently paved and graveled. The total current <br />property taxes are $3,811. This is estimated to remain on the tax rolls during the entire exemption <br />period. The annual exemption amount is estimated at $14,242 or $142,240 over ten years. <br /> <br />Timing <br />This application was submitted on February 20, 2008. The council has 90 days to review the Directors <br />Report and Recommendation. If the council hasn’t acted in 180 days the application is considered <br />approved. City Council consideration is currently within the first 90-day time period. <br /> L:\CMO\2008 Council Agendas\M080414\S0804148.doc <br />