Laserfiche WebLink
redevelopment of the Centre Court/Vacant Lot Property pursuant to this Agreement. The <br />Exhibit E-2 <br />terms of the Centre Court/Vacant Lot Construction Loan are set forth in . <br /> <br />“CC/VLP” <br />1.7 means certain real property, located <br />ENTRE OURTACANT OT ROPERTY <br />Exhibit A-1 <br />within the City of Eugene, more particularly described in . <br /> <br />“C” <br />1.8 means the City of Eugene, Oregon. <br />ITY <br /> <br /> “CL” <br />1.9means a “gross” lease between Beam, as lessor, and City, as <br />ITY EASE <br />lessee, under which, subject to certain conditions set forth in a separate written <br />agreement between the City and Beam, City will lease a certain amount of space in <br />the Newly Constructed Building. The conditions are included in Section 6.1 and the <br />Exhibit F <br />material terms of the City Lease are set forth in . <br /> <br /> “C” <br />1.10 means the conveyance of the Property to Beam by Agency by <br />LOSING <br />Deed. <br /> <br />“CD” <br />1.11 means the date on which Agency conveys the Property to <br />LOSING ATE <br />Beam and disburses the Loans proceeds to Beam. The Closing Date shall occur no <br />later than July 7, 2008. <br /> <br /> “C” <br />1.12 means the Eugene Code, 1971, effective as of June 16, 1971 as a result <br />ODE <br />of adoption of Ordinance No. 16226. <br /> <br />“CC” <br />1.13 means the date upon which Buyer has <br />OMMENCEMENT OF ONSTRUCTION <br />(i) obtained building permits from the City, (ii) obtained construction financing, in an <br />amount sufficient to complete redevelopment of the Project in accordance with this <br />Agreement, on terms acceptable to Beam AND (iii) issued a notice to proceed to the <br />general construction contractor for the Project pursuant to a binding contract for <br />construction. <br /> <br />CP” <br />1.14 “ mean elevations and other plans and information showing <br />ONCEPTUAL LANS <br />or demonstrating certain design elements, describing the uses and generally defining the <br />size and scope of the Project improvements. <br /> <br />CPS” <br />1.15 “ means the final plans and <br />ONSTRUCTION LANS AND PECIFICATIONS <br />specifications for the construction of the Newly Constructed Building and the <br />rehabilitation of the Centre Court Building. <br /> <br />“D” <br />1.16 means, collectively, bargain and sale deeds for the Centre Court/Vacant <br />EED <br />Lot Property and the Washburne Property duly executed and acknowledged by Seller, <br />conveying good and marketable fee simple title to Buyer subject to Seller’s right of re- <br />Exhibit B <br />entry and the Permitted Exceptions, if any, substantially in the form of . <br /> <br />“DD” <br />1.17 shall mean site and engineering plans, elevations and <br />ESIGN RAWINGS <br />typical cross sections identifying the Project buildings and other elements, including <br />Page 3 - PURCHASE AND SALE AGREEMENT – DRAFT #3 (20 May 2008) <br /> <br />