My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-00-01-F
COE
>
City of Eugene
>
Administrative Orders
>
2000
>
Admin Order 58-00-01-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:48:14 AM
Creation date
5/28/2008 12:03:24 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/30/2000
Document_Number
58-00-01-F
CMO_Effective_Date
3/30/2000
Author
Christine Andersen
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />also in compliance with all of the following criteria: <br /> <br />(1) The felling must be consistent with preservation of the site's future <br />development potential and preservation of important natural values as prescribed in <br />the Metro Plan and the Eugene Code, 1971; <br /> <br />(2) Wooded areas associated with natural drainageways and water areas <br />shall be retained to preserve riparian habitat and to minimize erosion; <br /> <br />(3) Wooded areas that will likely provide an attractive on-site amenity to <br />occupants of future developments shall be retained; <br /> <br />( 4 ) Wooded areas along ridgelines and hilltops shall be retained for their <br />scenic and wildlife habitat values; <br /> <br />( 5) Wooded areas along property lines shall be retained to provide buffers <br />from adjacent properties; <br /> <br />(6) Trees shall be retained in sufficiently large areas and dense stands so <br />as to ensure against windthrow; and <br /> <br />(7) Clear cuts of developable areas shall be avoided so as to retain a <br />wooded character of future building sites and to preserve housing and design options <br />for future City residents. <br /> <br />R-6.305-F <br /> <br />PERMIT ISSUANCE. <br /> <br />1. Except as provided in subsection 2 of this section, a permit shall be effective on the <br />date issued or such other date as may be specified in the permit. <br /> <br />2. If an application is granted after public notice and an opportunity for comment is <br />provided under R-6.305-D-5, the permit shall not be effective for a period of 15 days from the date <br />of the decision of the City Manager, or, in the event an appeal is filed under Section R-6.305-J, seven <br />days from the date of the decision of the hearings officer. If no written public comment is received <br />the permit can become effective on the date issued if the applicant waives their right to appeal. Any <br />tree felling pursuant to the permit shall constitute a waiver of the applicant's right to appeal. <br /> <br />3. A permit shall expire at midnight on the one year anniversary of the effective date <br />of the permit. <br /> <br />4. At the written request of the applicant, the City Manager may grant time extensions <br />to complete the work under a permit. <br /> <br />(a) A time extension shall not exceed 12 months. <br /> <br />Administrative Order - 8 <br /> <br />r: \adminord\rule\OOtreerem2ao. wpd(03/ 14/00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.