My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20234 Exhibit B
COE
>
City of Eugene
>
Ordinances
>
2001 No. 20220-20243
>
Ordinance No. 20234 Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:51 PM
Creation date
5/30/2008 3:17:07 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20234
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Geographic Estimated <br />Name Limits Description Jurisdiction Cost Length Number <br />Project Category: New Collectors <br />Status: Unprogrammed <br />19th Street Yolanda Avenue to Extend existing street as Springfield $891,000 0.33 703 <br /> Hayden Bridge Road 2-lane collector <br />30th Street Main Street to Centennial New collector street Springfield $904,500 0.67 915 <br /> Boulevard <br />36th Street Yolanda Avenue to Extend existing street as Springfield $1,701,000 0.63 709 <br /> Marcola Road 2-lane collector per Local <br /> Street Plan. <br />54th Street Main Street to Daisy New 2-lane collector Springfield $756,000 0.28 87 <br /> Street <br />79th Street Main Street to Thurston New 2 to 3-lane collector Springfield $1,000,000 0.37 18 <br /> Road <br />Avalon Street Greenhill Road to Terry New major collector Eugene $810,000 0.3 432 <br /> Street <br />Cardinal Way Game Farm Road to MDR Upgrade 2 to 3-lane urban Springfield $1,242,000 0.46 721 <br /> north-south connector facility <br />Daisy Street 46th Street to 48th Street New 2 to 3-lane urban Springfield $929,000 0.27 24 <br />Extension facility, traffic control <br /> improvements <br />Future Collector A Gilham to County Farm New neighborhood collector Eugene $1,890,000 0.7 651 <br /> Road @ Locke Street <br />Future Collector C1 Linda Lane - Jasper Road New 2 to 3-lane urban Springfield $1,350,000 0.5 33 <br /> Extension collector <br />Future Collector C2 Jasper Road - New 2 to 3-lane urban Springfield $3,510,000 1.3 36 <br /> Mountaingate collector <br />Future Collector C3 Jasper Road Extension - New 2 to 3-lane urban Springfield $1,890,000 0.7 39 <br /> East Natron collector <br />Future Collector C4 East-west in Mid-Natron New 2 to 3-lane urban Springfield $1,620,000 0.6 42 <br /> site collector <br />Future Collector C5 Loop Rd in South Natron New 2 to 3-lane urban Springfield $2,700,000 45 <br /> Site collector <br />Future Collector C6 Mt Vemon Road - Jasper New 2 to 3-lane urban Springfield $2,700,000 48 <br /> Road Extension collector <br /> <br />TransPlan-]oint Adopting Officials Revisions <br /> <br />September 200 1 <br />Chapter 3, Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.