Laserfiche WebLink
<br /> Geographic Estimated <br />Name Limits Description Jurisdiction Cost Length Number <br />Status: Unprogrammed <br />28th Street Main Street to Centennial Widen/provide sidewalks Springfield $1,050,000 0.7 909 <br /> Boulevard and bike lanes; provide <br /> intersection and signal <br /> improvements at Main Street <br />31 st Street Hayden Bridge Road to U Upgrade to 2 to 3-Iane urban Lane County $1,275,000 0.85 765 <br /> Street facility <br />35th Street Commercial Avenue to Upgrade to 3-lane urban Springfield $920,000 0.46 918 <br /> Olympic Street facility <br />42nd Street Marcola Road to Railroad Reconstruct to 3-Iane urban Springfield $2,060,000 1.03 713 <br /> Tracks facility <br />48th Street Main Street to G Street Upgrade to 2-lane urban Springfield $720,000 0.48 3 <br /> facility <br />52nd Street G Street to Upgrade to 2-lane urban Springfield $300,000 0.2 6 <br /> Eugene-Springfield facility <br /> Highway (SR 126) <br />69th Street Main Street to Thurston Widen on east side of Springfield $840,000 0.56 15 <br /> Road roadway <br />Agate Street 30th Avenue to Black Oak Upgrade to 2-lane urban Eugene $585,000 0.39 215 <br /> Road facility <br />Aspen Street West D Street to Reconstruct to 2 to 3-lane Lane County, $750,000 0.5 809 <br /> Centennial Boulevard urban facility Springfield <br />Baldy View Lane Deadmond Ferry Road to Upgrade to urban standards Springfield $420,000 0.28 715 <br /> the end of dedicated <br /> right-of-way <br />Bethel Drive Roosevelt Boulevard to Upgrade to 2-lane urban Eugene $2,500,000 1.68 414 <br /> Highway 99 facility <br />Centennial Blvd. March Chase to 1-5 Upgrade to urban facility Eugene $400,000 0.4 697 <br /> (north side) <br />Commercial Street 35th Street to 42nd Street Upgrade to 3-lane urban Springfield $1,620,000 0.81 933 <br /> facility <br />County Fann Loop North-to-South Section Upgrade to 3-lane urban Lane County, $825,000 0.55 631 <br /> facility Eugene <br />County Fann Loop West-to-East Section Upgrade to 2-lane urban Lane County, $795,000 0.53 632 <br /> facility Eugene <br />Deadmond Ferry Baldy View Lane to Upgrade to urban standards Springfield $1,095,000 0.73 724 <br />Road McKenzie River <br />Division Avenue Division Place to River Upgrade to 2 to 3-lane urban Eugene $1,720,000 0.86 509 <br /> Avenue facility <br />Elmira Road Bertelsen Road to Upgrade to 2-lane urban Eugene $1,815,000 1.21 420 <br /> Highway 99 facility <br />TransPlan-loint Adopting Officials Revisions September 200 1 <br /> Chapter 3, Page 25 <br />