Laserfiche WebLink
<br /> Geographic Estimated <br />Name Limits Description Jurisdiction Cost Length Number <br />1.105 Washington/Jefferson Extend third SB lane over OOOT $5,805,000 0.75 151 <br /> Street Bridge bridge to 6th Ave exit, add <br /> lane to 6th Ave off-ramp <br /> <br />Status Sub-Total <br /> <br />$72,495,200 <br /> <br />Project Category Sub-Total <br /> <br />$93,944,200 <br /> <br />TransPlan-Joint Adopting Officials Revisions <br /> <br />September 200 1 <br />Chapter 3, Page 17 <br />