Laserfiche WebLink
Policy 15. Ultimately, land within the UGB shall be annexed to a city and provided with the <br />required minimum level of urban facilities and services. While the time frame for <br />annexation may vary, annexation should occur as land transitions from urbanizable <br />to urban. (page II-C-5) <br /> <br />As addressed below under subsection (3), and consistent with these policies, a minimum level of <br />key urban facilities and services can be provided to the area in an orderly and efficient manner. <br /> <br />The Metro Plan designates the annexation area as appropriate for Low Density Residential use. <br />The River Road Santa Clara Urban Facilities Plan (RR/SC UFP) is the adopted refinement plan <br />for the subject property. The subject property is not located within an identified subarea of the <br />RR/SC UFP. None of the general "Residential Land Use Policies" appear to be directly applicable <br />to the subject request. The "Public Facilities and Services Element" policies of the RR/SC UFP are <br />directed at local government; however, the premise of these policies (regarding the provision of <br />urban services) is the assumption that the properties within the UGB will be annexed. <br /> <br />As discussed in this subsection, and further detailed under subsection (3) below, the proposed <br />annexation is consistent with the Metro Plan growth management policies and can be served by <br />the minimum level of key urban services. The annexation procedures beginning at EC 9.7800 <br />are consistent with State law and therefore, as found throughout this report, the annexation is <br />consistent with State law. <br /> <br />Therefore, based on the findings above, the proposal is consistent with the applicable policies of <br />the Metro Plan. <br />EC 9.7825(3) The proposed annexation will result in a boundary in which the minimum level of key urban <br />facilities and services, as defined in the Metro Plan, can be provided in an orderly, efficient, <br />and timely manner. <br />Complies Findings: Consistent with this criterion, the proposed annexation will result in a boundary in <br />which the minimum level of key urban facilities and services can be provided in an orderly, <br /> NO <br />efficient, and timely manner as detailed below: <br />YES <br /> <br />Wastewater <br />Public wastewater is available within Hansen Lane. The subject properties are currently vacant; <br />as-built records (microfile no. 3066.020), show an existing wastewater service is stubbed to the <br />property. The lien docket indicates there are related On-hold assessments that will become <br />payable at the time of development. <br /> <br />Stormwater <br />Public stormwater systems are not immediately available to serve this property. The nearest <br />public system is near the intersection of Hansen Lane and River Road, approximately 200 feet <br />east of the subject properties. The applicant acknowledges that extension of the public system <br />may be necessary to serve development; this would be at the expense of the <br />applicant/developer. Development proposals must demonstrate consistency with flood control <br />standards. On-site retention may be an acceptable option if on-site infiltration rates and design <br />calculations are provided to demonstrate feasibility. <br /> <br />Transportation <br />The property abuts Hansen Lane, a Lane County Road. City of Eugene Public Works defers to <br />Lane County referral comments. Compliance with applicable street standards will be ensured at <br />the time of development. <br /> <br /> <br />Forzano (A 16-4) June, 2016 Page 2 <br />