Laserfiche WebLink
<br />In accordance with Lane Code 15.205(1), a Facility Permit shall be required for placement of facilities <br /> <br />within the right-of-way of County roads. Facilities and development includes, but is not limited to, road <br />improvements, sidewalks, new or reconstructed driveway or road approach intersections, utility <br />placements, excavation, clearing, grading, culvert placement or replacement, storm water facilities, or <br />any other facility, thing, or appurtenance. A Facility Permit may be required for any future connection to <br />Hansen Lane. Please contact 541-682-6902 or visit this link for information regarding facility permits: <br />http://www.lanecounty.org/Departments/PW/Engr/RightofWay/Pages/rowpermits.aspx <br /> <br />In accordance with Lane Manual 15.515, storm water runoff from private property shall not be directed <br /> <br />to the Lane County road right-of-way, or into any Lane County drainage facility, including roadside <br />ditches. Ditches adjacent to County roads are designed solely to accommodate roadway storm water <br />runoff. <br /> <br /> <br />For information regarding EWEB requirements at the time of development, please contact Bill Johnson, <br /> <br />EWEB Water, at 541-685-7377; Jon Thomas, EWEB Electric, at 541-685-7472; and Lori Price EWEB Right- <br />of-Way, at 541-685-7366 <br /> <br /> <br />Approval of this annexation does not relieve the applicant from complying with applicable codes and <br /> <br />statutory requirements. <br /> <br /> <br />Forzano (A 16-4) June, 2016 Page 4 <br />