My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: Ordinance on MUPTE Boundary
COE
>
City of Eugene
>
Council Agendas 2008
>
CC Agenda - 07/21/08 Public Hearing
>
Item 1: Ordinance on MUPTE Boundary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:16:38 PM
Creation date
7/18/2008 9:46:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/21/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Issues raised by City Councilors on May 27, 2008 <br /> <br />How many developments were constructed after being denied MUPTE approval? For those <br />constructed after being turned down, was there a significant design change? <br /> <br />Answer: No proposed developments have been constructed after being denied a MUPTE. Two applicants <br />that were turned down have reapplied. Both applications include design changes. <br /> <br />How many housing units were constructed in the West University Neighborhood with and without <br />MUPTE, since 1995? <br /> <br />Answer: There were 299 housing units constructed in the West University Neighborhood since 1995. <br />They are summarized below. <br />Eight developments received MUPTE approval 177 units (59%) <br />Six developments were too small to qualify for MUPTE (fewer than 5 units) 20 units (7%) <br />Six developments were outside the MUPTE boundary 55 units (18%) <br />Three developments were inside the boundary and were built without MUPTE 47 units (16%) <br /> <br /> <br />Is the requirement to construct five units or more to qualify for MUPTE above and beyond existing <br />units that might be removed in the process, and does a rehabilitation count as adding a unit? <br /> <br />Answer: The MUPTE requirement for construction of five or more units is based on state statute. It does <br />not require a net gain of five units. Therefore, it is possible, for example, to qualify by removing one unit <br />of housing and then replacing it with five. Staff is not able to identify an instance where this has actually <br />occurred in Eugene. A MUPTE is also possible if an existing structure that is not in housing use (such as <br />an office building or warehouse) was rehabilitated to create five or more housing units. Eugene has not <br />th <br />received any applications for this type of activity. Nozama Apartments on 19 Avenue received a MUPTE <br />for a substantial rehabilitation when buildings that were a part of the former Amazon Student Housing <br />were relocated to the site. <br /> <br />How does staff monitor, after the fact, the need for each project’s “but for” requirement? <br /> <br />Once a project is approved, staff only monitors if the project is built and if it is substantially the same as <br />what was approved. At the time a MUPTE application is submitted to the City the proposal is typically in <br />an advanced conceptual state. The developer presents a concept, basic drawings, and a financial pro- <br />forma, but has not submitted plans for building permits. The financial projections that are presented are <br />reviewed by staff knowledgeable about housing finance. Under the newproposed standards, additional <br />review would come from Eugene’s Loan Advisory Committee. Once approved by the council, the <br />developer proceeds with investing in the more detailed design and permitting process with the knowledge <br />that the tax exemption has made the project feasible. If the development has a substantial change in plans <br />it would be a violation of the MUPTE approval and would need to come back to the City Council for re- <br />approval. Examples of a substantial change would be a deviation in the number of units by more or less <br />than 10%, or adding additional floors. Less significant changes are often inevitable during the design, <br />building permit and inspection process. <br /> <br /> <br /> Z:\CMO\2008 Council Agendas\M080721\S0807211.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.