My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda-3/08/04WS
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-03/08/04WS
>
CCAgenda-3/08/04WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:12:50 PM
Creation date
3/5/2004 8:57:19 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/8/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The details of planning, design, impacts and potential benefits and construction cost would <br />be addressed through a future feasibility study. Any associated rerouting of the downtown <br />shuttle would be addressed by the study. Adoption of the CATS document itself would not <br />pre-approve the construction of the project; it only identifies the project as one needing <br />further study. <br /> <br />The Eugene Planning Commission on October 27, 2003 modified the Proposed <br />Implementation Strategy Z3 in the Draft 2003 CATS to delete second sentence of the <br />discussion as follows: <br /> <br />"Discussion: A future Breeze shuttle route will lil~ely be considered within the next five to <br />ten years. A y ............................ 6..~-. .... ~ .............................. ~ ~. <br />.... · ; ..... ,; .... r.. ,~. ....... a, ...... ~-""~- The addition of a second shuttle couM affect <br />transit routing within the downtown arem.. " <br /> <br />The CATS draft as considered by the Eugene City Council no longer contains reference to <br />a transit river crossing. <br /> <br />Page 4 of 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.