Laserfiche WebLink
The Airport is expecting to complete significant improvements during the CIP period totaling <br />almost $18 million. The FY06 program includes paving preservation, installing an emergency <br />generator at the Aircraft Rescue and Fire Fighting Station, and replacing the HVAC system in <br />the terminal. In future years, expected projects include a de-icing collection system and <br />expansion of the terminal building. <br /> <br />Major projects are also anticipated over the next six years in the Public Buildings and Facilities <br />category. The approximately $51 million of funded projects in this category are mainly for <br />preservation and maintenance of existing City facilities and Phase 1 of the City Hall <br />Replacement Projects. The Budget Committee has recommended that Phase 1 of City Hall <br />Replacement be combined with Phase 2 and reflected as an unfunded project in FY09. <br /> <br />The City's wastewater system is scheduled for almost $12.5 million of improvements in the next <br />few years. Included in these improvements is $8.5 million to preserve and rehabilitate the aging <br />wastewater system, decrease inflow and infiltration and address increased wet weather flows. <br /> <br />Over $7 million of improvements to the stormwater system are planned in this CIP. The <br />restoration effort includes a partnership with the U.S. Army Corps of Engineers and other metro <br />agencies to complete projects that may include restoration of portions of Amazon Creek and <br />salmon habitat restoration. Also included are restoration and enhancement of the wetlands in <br />West Eugene. <br /> <br />Finally, the Parks and Open Space program is anticipating about $13 million of improvements <br />during the CIP period. Because the Draft Parks, Recreation, and Open Space Comprehensive <br />Plan is still being reviewed, the CIP does not include any unfunded projects. The complete list <br />of Parks, Recreation, and Open Space CIP projects will be included in future CIP documents. <br /> <br />Unfunded Projects <br /> <br />Also included in the CIP are projects totaling $227 million for which funding has not been <br />identified. As drafted, the Public Buildings and Facilities category includes $131 million of <br />these unfunded projects. The largest project in this category is the consolidation of general City <br />services in Phase 2 of City Hall Replacement. If the council accepts the Budget Committee's <br />recommendation to combine the City Hall replacement projects, the amount of unfunded projects <br />will increase by approximately $29 million. <br /> <br />Transportation projects continue to reflect significant need for additional funding. The CIP <br />includes approximately $67 million of unfunded projects that would upgrade and enhance <br />capacity and preserve and maintain existing assets, as well as build new bike paths, collectors <br />and other improvements. The Stormwater and Wastewater categories identified a total of <br />approximately $29 million of unfunded projects. <br /> <br />CIP Development and Review <br /> <br />During the summer and early fall of even numbered years staff compiles the Draft CIP using <br />input and requests from a variety of sources, including neighborhood groups, individual citizens, <br />adopted plans and policies, etc. <br /> <br /> L:\CMO\2005 Council Agendas\M050228\S0502283.doc <br /> <br /> <br />