Laserfiche WebLink
1. SUBSTITUTE CEMBRIT PANEL.2. ELIMINATE SECONDARY BACK UPCHANNEL AND ATTACH DIRECTLY 3/8"ALUMINUM TRIM REVISION 1. 3/8" GALVANIZED OR POWDEREQUITONE EXPOSED FASTENER1. PRECAST WITH <br /> 12' FORM LINER.2. PRECAST WITH SMOOTH ACIDINSULATION TO MATCH TYPICAL AT4. PORTLAND CEMENT STUCCORAIN SCREEN. WALL FRAMING,INSULATION TO MATCH TYPICAL AT <br />2. HEAVY GAGE SHEETMETAL <br />BASE MATERIAL OPTIONS: <br />ATTACHMENT TO DETAILED COST REDUCTION <br />TO KNIGHT WALL SYSTEM. <br />CEMENT PANEL CLADDING 3. BRICK - WALL FRAMING, <br />DELETED WALL SURFACE <br />MP-1 REVISION OPTIONS:1. GAGE METAL CLADDING -NORTH CLAD AL SERIES OR <br />COATED STEEL. SIMILAR <br />WEATHER BARRIER ANDWEATHER BARRIER AND <br />2. EQUITONE EXPOSED <br />FASTENER CLADDING <br />FCP-1, FCP-2, FCP-3: <br />UPPER FLOORS.UPPER FLOORS.STRATEGIES <br />DIAGRAM KEY <br />2016-09-01 <br />ALUMINUM. <br />CLADDING. <br />OPTIONS: <br />SIMILAR. <br />WASH. <br />3. <br />DELETE LOUVERS. REPLACE WITH BASE MATERIAL <br />DELETE LADDER AND GATES <br />DELETEELECTRICOPERATION <br />DELETE <br />DELETE <br />DELETE <br />DELETEDELETE <br />CONSTRUCTION DOCUMENT MARKUPS <br />DELETE <br />COST REDUCTION STRATEGIES <br /> <br />