My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2B - Res.on SDC Adjustment
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 03/07/05 Mtg
>
Item 2B - Res.on SDC Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:30:48 PM
Creation date
3/2/2005 3:48:26 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
3/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> <br /> RESOLUTION NO. <br /> <br /> A RESOLUTION ADOPTING AN INFLATIONARY ADJUSTMENT OF <br /> SYSTEMS DEVELOPMENT CHARGES FOR LOCAL WASTEWATER <br /> SYSTEM, STORMWATER SYSTEM, AND TRANSPORTATION <br /> SYSTEM; SUPERSEDING ADMINISTRATIVE ORDER $8-04-04-F; AND <br /> AMENDING RESOLUTION NO. 4740. <br /> <br /> The City Council of the City of Eugene finds as follows: <br /> <br /> A. On September 23, 2002, the System Development Charges (SDC) Methodologies <br />were adopted by Resolution No. 4740. <br /> <br /> B. Resolution No. 4740 has subsequently been amended by Resolution Nos. 4748, <br />4767, 4768, 4770, 4794 and 4795. Resolution No. 4793 dated June 28, 2004, adopted the <br />MWMC Facilities Plan 20-year project list. In addition, inflationary adjustments of Systems <br />Development Charges for Local Wastewater System, Stormwater System, and Transportation <br />System were adopted by Administrative Order No. 58-04-04-F, effective April 5, 2004. <br /> <br /> C. Based on the national 20-city average Construction Cost Index as published by <br />the Engineering News-Record, it is necessary to amend portions of the Systems Development <br />Charges by implementing a 6.5% inflationary increase for Local Wastewater System, the <br />Stormwater System, and the Transportation System. Section 2.4 of the SDC Methodologies <br />requires that revisions to fees by more than five percent shall be established by resolution of the <br />Council. <br /> <br /> D. These inflationary adjustments to the Systems Development Charges are in <br />conformity with applicable state law, authorized by EC 7.710(5) and Section 2.4 of the <br />Methodologies, and should be implemented effective April 18, 2005. <br /> <br /> NOW, THEREFORE, based upon the above findings, <br /> <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a <br />Municipal Corporation of the State of Oregon, as follows: <br /> <br /> Section 1. Portions of the Systems Development Charges are amended by implementing <br />a 6.5% inflationary increase to the Local Wastewater System, the Stormwater System, and the <br />Transportation System, as set forth in Exhibit A attached hereto. <br /> <br /> Section 2. Administrative Order No. 58-04-04-F is superseded, and Resolution No. 4740 <br />is amended as described in Section 1, as of the effective date of this Resolution. <br /> <br /> Section 3. The City Recorder is requested to append a copy of this Resolution to <br />Resolution No. 4740 and a copy (without its attachments) to Administrative Order 58-04-04-F. <br /> <br />Resolution - Page 1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.