My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-16 Agenda Packet
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2016
>
10-24-2016
>
10-24-16 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 11:28:01 AM
Creation date
10/21/2016 11:27:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Packet
CMO_Meeting_Date
10/24/2016
CMO_Effective_Date
7/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review of an application to annex property, divide land, develop or use property, or , or a refinement plan, shall be processed as provided in \] <br />Individual phases of a PUD may not be submitted for final PUD review until the boundaries <br />application shall clearly state whether the applicant is electing to use the general approval criteria <br />, <br />Application Procedures, and any additional requirements of EC 9.8000 through 9.8865. To <br />9.7885 <br />Final PUD plans may be submitted in phases, if such phases were approved as part of the <br />osal includes needed housing, as <br /> <br />of the phases are legal lots as defined in this land use code, and documents necessary to <br />planning commission approves the conditional use permit, and then only in accordance with the <br />found in EC 9.2000 through 9.3915, which identify various uses that require approval of a <br />, Application Procedures. When a conditional use permit is required for the proposed use <br />, <br />ATTACHMENT A <br />ntative PUD consideration. The boundaries of each phase of the final PUD plans shall <br /> <br />tions 9.8000 through 9.8865 are <br />9.7835 <br />coincide with the boundaries of the phasing areas approved at the tentative plan stage. <br />particular land use application. Land use applications referred to in EC 9.8000 through <br />. <br />Conditional use applications shall be <br />facilities, landscaping, open space, and outdoor living areas have been executed and <br />no development permit application shall be accepted by the city until the hearings official or <br />40 <br />, of buildings, common use <br />Applicability and Effect of Application Requirements, Criteria, and Concurrent Review <br />\[ <br />processed in accordance with the application procedures contained in EC 9.7000 through <br />defined by state statutes, the written statement submitted with the conditional use permit <br />Requests to extend the time frame for a specific phase shall be subject to EC 9.73 <br />\] <br /> <br />the extent there is a conflict, the provisions in EC 9.8000 through 9.8865 control. <br />9.7885 <br />\[ <br />ents in EC 9.7000 through <br />assure permanent maintenance, at no expense to the city <br />terms and conditions of that conditional use permit. If the prop <br />Additional provisions addressing the applicability of sec <br /> <br />. <br />Application Requirements <br />9.8865 are subject to the procedural requirem <br /> <br />Corrective <br /> <br />Metro Plan. <br /> <br />9.7835 <br />Type: <br /> <br />enumber remaining section <br />\] <br />9.7885 <br />amend this land use code, the <br />Conditional Use Permit <br />\[ <br />sections 9.7000 through <br /> <br /> <br />. <br /> <br />\] <br />recorded. <br />Expiration <br /> <br />. <br />Introduction <br />te <br />r <br />\[ <br />9.7835 <br />* <br /> <br />Proposed Change: <br /> <br />(2)(3)(1) <br /> <br />eferences <br /> <br />9.70009.80059.8085 <br /> <br />R <br /> <br />Metro Plan Amendment Process <br />this creates a situation that is impossible are intended to ly, this provision needs to As a result of the Metro Plan ) . <br />Ordinance No. 20400 <br />set up the phase boundaries, to be <br />, <br />EC <br />subdivision (which <br />were added <br />approved until the implementing <br /> that <br />9.7835 <br />creates the legal lots) cannot be <br />subsequent subdivision process. <br />The approved <br />were <br />lots (such as a residential PUD), <br /> <br />EC <br />references to <br /> <br />ections <br />throughout the code <br /> <br />Amendment Process Code <br /> <br /> <br />EC <br />. <br />implemented though the <br />EC 9.7800 through 9.7885 <br /> <br />to reflect these changes <br /> <br />to <br />9.7800 through 9.7835 <br /> <br />plans for a final PUD <br />amended <br />, and new s <br /> <br /> <br />several <br />PUD is finalized. <br />, as the <br />Amendments ( <br /> <br />be removed. <br />o be <br />There are <br />According <br />repealed <br />to meet <br /> <br /> <br />9.7885need t <br />Issue: <br /> <br />19. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.