My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-16 Agenda Packet
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2016
>
10-24-2016
>
10-24-16 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 11:28:01 AM
Creation date
10/21/2016 11:27:38 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Packet
CMO_Meeting_Date
10/24/2016
CMO_Effective_Date
7/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> Section 23 <br />. Section 9.8085 of the Eugene Code, 1971, is amended to provide as <br />follows: <br /> <br />9.8085 Conditional Use Permit Application Requirements. <br /> Conditional use applications <br />shall be processed in accordance with the application procedures contained in EC <br />9.7000 through \[9.7885\] 9.7835, Application Procedures. When a conditional use <br />permit is required for the proposed use, no development permit application shall be <br />accepted by the city until the hearings official or planning commission approves the <br />conditional use permit, and then only in accordance with the terms and conditions of <br />that conditional use permit. If the proposal includes needed housing, as defined by <br />state statutes, the written statement submitted with the conditional use permit <br />application shall clearly state whether the applicant is electing to use the general <br />approval criteria in EC 9.8090 Conditional Use Permit Approval Criteria - General <br />instead of the approval criteria found in EC 9.8100 Conditional Use Permit Approval <br />Criteria - Needed Housing. <br /> <br /> <br /> Section 24 <br />. Subsection (8)(a) of Section 9.8090 of the Eugene Code, 1971, is amended <br /> <br />to provide as follows: <br />9.8090Conditional Use Permit Approval Criteria - General. <br /> A conditional use permit <br />shall be granted only if the proposal conforms to all of the following criteria: <br />(8) <br /> The proposal complies with all applicable standards, including but not limited <br />to: <br />(a) EC 9.2000 through \[9.3915\] 9.3980 regarding lot dimensions, solar <br />standards, and density requirements for the subject zone; <br /> <br /> <br /> Section 25 <br />. Subsection (1)(a) of Section 9.8215 is amended to provide as follows: <br />9.8215 Partition, Tentative Plan Approval Criteria- General. <br /> The planning director shall <br />approve, approve with conditions, or deny a partition, with findings and conclusions. <br />Approval, or approval with conditions, shall be based on compliance with the <br />following criteria: <br />(1) <br /> The proposed partition complies with all of the following, unless specifically <br />exempt from compliance through a code provision applicable to a special area <br />zone or overlay zone: <br />(a) Lot standards of EC 9.2000 through \[9.3915\] 9.3980 regarding <br />applicable parcel dimensions and density requirements. Within the /WR <br />Water Resources Conservation Overlay Zone or the /WQ Water Quality <br />Overlay Zone, no new lot may be created if more than 33% of the lot, as <br />created, would be occupied by either: <br />1. The combined area of the /WR conservation setback and any <br />portion of the Goal 5 Water Resource Site that extends landward <br />beyond the conservation setback; or <br /> 2. The /WQ Management Area. <br /> <br /> <br />Ordinance - Page 9 of 16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.