Laserfiche WebLink
<br />ATTACHMENT D <br /> <br />I <br /> <br />AGENDA ITEM SUMMARY <br /> <br />I <br /> <br />DATE OF MEETING: <br /> <br />June 12, 2006 <br /> <br />ITEM TITLE: <br /> <br />WALNUT STATION MIXED-USE AREA <br /> <br />PREPARED BY: <br /> <br />Anita Yap, Transit Planner <br /> <br />ACTION REQUESTED: <br /> <br />None. Discussion only. <br /> <br />BACKGROUND: <br /> <br />The City of Eugene is developing a conceptual plan for redevelopment of <br />the area surrounding the Walnut EmX Station. The Walnut Station area <br />has been identified as a priority Mixed-Use Area (formerly called a node). <br /> <br />The first phase of the study has been completed and the second phase will <br />be starting soon. The attached memorandum from the City of Eugene <br />provides background on the study and lists some of the major issues to be <br />evaluated as the planning process moves forward. You will note that a key <br />issue is whether the design accommodates a second EmX lane in this <br />area. <br /> <br />ATTACHMENT: <br /> <br />Memorandum from the City of Eugene providing information on the Walnut <br />Station Mixed-Use Area Planning Study. <br /> <br />PROPOSED MOTION: <br /> <br />N/A <br /> <br />\\ltd-gln-files\workgroup\Reference\Board Packet\2006\06\Joint Meeting with ECC 6-12-06\Walnut Station summary.doc <br />