Laserfiche WebLink
<br />DATE OF MEETING: <br /> <br />ITEM TITLE: <br /> <br />PREPARED BY: <br /> <br />ACTION REQUESTED: <br /> <br />BACKGROUND: <br /> <br />ATTACHMENT: <br /> <br />PROPOSED MOTION: <br /> <br />ATTACHMENTE <br /> <br /> <br />ITEM <br /> <br /> <br />June 12, 2006 <br /> <br />FRANKLIN EmX TOUR <br /> <br />Mark Pangborn, General Manager <br /> <br />None. <br /> <br />The joint meeting will conclude with a bus tour of the Franklin EmX corridor. <br />The tour is scheduled to depart the Glenwood facility at approximately 6:40 <br />p.m. The bus should return to Glenwood by approximately 7:30 p.m. <br /> <br />Memorandum providing background for the Franklin EmX tour. <br /> <br />N/A <br /> <br />\\ltd-gln-files\workgroup\Reference\Board Packet\2006\06\Joint Meeting with ECC 6-12-06\Franklin EmX summary.doc <br />