My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4875
COE
>
City of Eugene
>
Resolutions
>
2006 No. 4856-4897
>
Resolution No. 4875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:50:03 PM
Creation date
6/14/2006 4:39:45 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/12/2006
Document_Number
4875
CMO_Effective_Date
6/12/2006
Repeal_Date
5/7/2007
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX C <br /> <br />Growth Capacity Allocation Documentation <br /> <br />Liquids Treatment <br /> <br />A summary of the MWMC liquids treatment capacity is presented in Table C-l. <br /> <br />TABLE C-1 <br />Capacity Summary of MWMC Uquids Facilities <br /> Average Flow Peak Flow BOD TSS <br /> Population (mgd) (mgd) (Ibs/day) (I bs/day) <br />Existing capacity 49 175 66,000 71 ,600 <br />Current loading (current 217,737 43.8 264 54,800 64,700 <br />capacity required) <br />Available capacity (value) 5.2 None 11,200 6,900 <br />. Available capacity (%) 10.5% 0% 17.0% 9.6% <br />Projected 2025 loading 297,585 59 277 74,000 87,600 <br />(future capacity required) <br />Growth loading 79,848 15.5 308 19,200 22,900 <br />Required Capacity 10 102 8,000 16,000 <br />Expansion <br />Growth share of 2025 load 26.8 26.1% 10.8% 25.9% 26.1% <br />Growth share of capacity 100% 100% 29A% 100% 100% <br />expansion <br /> <br />Notes: <br />A The 30-mgd peak flow attributed to growth consists of 15.5 mgd of average flbw and 14.5 mgd of wet season 1/1 <br />flow. See the following discussion for a detailed derivation of these values. <br /> <br />The rationale for these values is presented in the follo.wing paragraphs. <br /> <br />Average Flow <br /> <br />The existing capacity is stated in the current NPDES permit as 49 mgd that represents the <br />dry season design rating for the WPCF. The current loading or current required capacity is <br />43.8 mgd (presented in DSMM terms). The DSMM value is used to compare to $e dry <br />season design rating of the WPCF because the NFDES discharge permit stipulates that the <br />WPCF meet monthly average permit requirements. Therefore, discharge permit - <br />requirements must be met on a dry season, maximum-month influent condition. This <br />43.8-mgd value is determined as fqllows: <br /> <br />A-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.