My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20369
COE
>
City of Eugene
>
Ordinances
>
2006 No. 20357-20374
>
Ordinance No. 20369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:46:05 PM
Creation date
6/15/2006 2:20:00 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
6/12/2006
Document_Number
20369
CMO_Effective_Date
7/14/2006
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(2) The amendments are consistent with applicable provisions of the Metro Plan and applicable <br />adopted refinement plans. <br /> <br />The proposed code amendments add regulations to the Land Use Code with the intent of protecting <br />life and property from flood and drainage hazards, reducing the impacts that urbanization is having <br />on the City's water quality, protecting waterways in the headwater areas from erosive effects of <br />increases in stormwater runoff, protecting the City's stormwater system from oil and grease from <br />stormwater runoff, and preventing stormwater pollution by eliminating pathways that may introduce <br />pollutants into stormwater. Generally, the stormwater development standards fall into the following <br />five categories: <br /> <br />1. EC 9.6790, Stormwater Destination, applies to all new development and redevelopment and is <br />intended to protect life and property from flood and drainage hazards by maintaining the capacity of <br />the City's stormwater conveyance system through the establishment of destination regulations for <br />stormwater runoff from development. This provision requires applicants proposing new <br />development to submit documentation showing the stormwater destination into which the <br />development will be disposed. The documentation must establish that the existing stormwater <br />drainage facilities into which the stormwater from the proposed development will dispose has the <br />capacity to handle the stormwater runoff that will be generated by the proposed new development for <br />the flood control design storm. If the applicant cannot establish that existing stormwater drainage <br />facilities have such capacity, the applicant must construct new storm drainage facilities to <br />accommodate the stormwater draining from the proposed development. <br /> <br />2. EC 9.6791, Stormwater Pollution Reduction, applies to land use applicants requesting approval <br />of a cluster subdivision, a conditional use, a partition, a planned used development, site review, or a <br />subdivision tentative plan and is intended to reduce the impacts that urbanization is having on the <br />City's water quality by providing standards for the capture and treatment of stormwater runoff from <br />development. This provision requires that applicants include pollution reduction facilities selected <br />from the Stormwater Management Manual that treat all of the stormwater runoff from the <br />development site that will result from the water quality design storm. The pollution reduction <br />facilities must be sited, designed and constructed according to the Manual and must be designed <br />using one of the three methodologies outlined in the Manual. <br /> <br />3. EC 9.6792, Stormwater Flow Control, applies to all land use applications for development sites <br />in the headwaters area requesting approval of a cluster subdivision, a conditional use, a partition, a <br />planned used development, site review, or a subdivision tentative plan and is intended to protect <br />waterways in the headwaters area from the erosive effects of increases in stormwater runoff peak <br />flow rates and volumes resulting from development. The provision requires that applicants <br />demonstrate, using methodology in the Stormwater Management Manual, that peak rates of flow <br />delivered to an existing open waterway at a point above 500 feet in elevation will not increase during <br />storms larger than the water quality design storm and smaller than the flood control design storm as a <br />result of the development. The facilities to control the rate of stormwater runoff must be sited, <br /> <br />Exhibit A to Ordinance No. 20369 <br />Findings of Consistency <br />
The URL can be used to link to this page
Your browser does not support the video tag.