My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20200
COE
>
City of Eugene
>
Ordinances
>
2000 No. 20184-20219
>
Ordinance No. 20200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 11:00:20 AM
Creation date
7/7/2006 3:21:21 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/26/2000
Document_Number
20200
Author
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2 <br />-2 <br /> <br />Item Site I Existing Designation Proposed Designation <br /> I <br />No. Name <br />18. B7 Restoration/Protection Change strip along Greenhill Road <br /> to Planned Transportation Corridor. <br /> No change to remainder of site.* <br />19. B8 Restoration Change strip along Greenhill Road <br /> to Planned Transportation Corridor. <br />--- <br />O. BI0 Undesignated Restoration. <br />-- <br />I. BA U ndesignated Change strip along Green Hill Road <br /> I Protection to Planned Transportation Corridor, <br /> change remainder to Restoration. <br />22. C2 Change area within W. 11th right-of- <br /> way to Planned Transportation <br /> Corrid0r. Change corridor along <br /> Amazon to Utility Corridor. <br />23. C3a Protection/Development Change corridor along existing <br /> storm sewer line to Utility Corridor, <br /> and change corridor along existing <br /> sanitary sewer line to Utility <br /> Corridor. <br /> No change to remainder of site. * <br />23a. C4 Protection Change corridor along existing <br /> storm sewer line from Protection to <br /> Utility Corridor. <br />23b. C5 Protection Change corridors along existing <br /> i storm sewer lines from Protection to <br /> I <br /> Utility Corridor. I <br />24. C6a-b Development/undesignated Change whole site to Development. <br />25. C6c-e Undesignated, except for former site Change whole site to Protection, <br /> C6d (was designated Development except change tax lot 400 on west <br /> in error) and C6e (Protection) end to Restoration and corridors <br /> along existing storm sewer lines to <br /> Utility Corridor. <br />--- f---- <br />26. C6f U ndesignated/Development Change whole site to Development. <br />27. C6g U ndesignated/Development Change whole site to Development. <br /> Has been partially filled. \ <br /> <br />Multiple Site Ordinance, Exhibit A (Plan Amendments) <br /> <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.