Laserfiche WebLink
<br />The southwest field is on a tax lot that does not have frontage on West 18th Avenue. Furthermore, <br />the southwest field is over 1400 feet from West 18th at its nearest point, and existing development <br />lies between the southwest field and the nearest street (Willow Creek Circle) that connects to <br />West 18th. Therefore, the southwest field does not have frontage on a major street and does not <br />meet this criterion. <br /> <br />The north area has direct frontage on West 18th Avenue, a major street, and, therefore meets this <br />criterion. <br /> <br />5. Site has unique characteristics which make it of special importance to the <br />economic development of West Eugene, and allowing development of site would <br />further the goals and objectives of the West Eugene Wetlands Plan. <br /> <br />In terms of economic development value, the important characteristics of this site include that it <br />is one of only four sites designated special light industrial in the Metro Plan. Of the four special <br />light industrial sites in the Metro Plan, three are in West Eugene. Of the other two West Eugene <br />special light industrial sites, more than 500/0 is designated protected wetland. Since the area <br />planned for special light industrial use has been decreased by protection of wetlands, land in this <br />category is relatively scarce. The undeveloped portion of this site (including the phase 2 area) <br />is also important to Hyundai as a possible future expansion site due to its size and its proximity <br />to phase 1. We conclude that these characteristics are sufficient to make this site of special <br />importance to the economic development of West Eugene, and that the entire site, as well as each <br />of the sub-areas, meet this criterion. <br /> <br />6. Site characteristics, including size, location and surrounding uses and activities <br />are such that there exists a high probability that the site cannot be protected in <br />perpetuity through the West Eugene Wetlands Program. <br /> <br />The southeast field is currently adjacent on three sides to undeveloped, primarily natural open <br />space. The approved development of both phases 1 and 2 of the Hyundai development and the <br />on-site mitigation project are required under conditions of the federal wetland permit not to have <br />adverse impacts upon the remaining wetlands. The area currently being developed with phase <br />1 and its accompanying parking lots and stormwater quality control structure is approximately <br />300 to 400 feet from the wetlands within the southeast field. The closest constructed feature is <br />the stormwater facility with landscaped berms (300-400 feet away), while the main buildings and <br />parking lots are 600 to 700 feet away. These distances help to buffer the wetlands within the <br />southeast field from impacts associated with the new development. The new development <br />(buildings and parking lots) is next to roughly 700-800 feet of the perimeter of the southeast field, <br />out of a total perimeter of approximately 4,000 feet. Given the nature of surrounding uses, the <br />size of the contiguous wetland area (more than 20 acres, including the mitigation site), the <br />surrounding open space, the limited portion of the perimeter that is near development and the <br />distance from that development, we conclude that the southeast field could be protected in <br />perpetuity, and therefore does not meet this criterion. <br /> <br />Hyundai Site Ordinance, Exhibit C (Refinement Plan Amendment Findings) <br /> <br />Page 11 <br />