Laserfiche WebLink
<br />Assessment Cost <br /> <br />Costs listed below are the Engineer's estimate for the 1997 construction. <br /> <br />The estimated costs reflect the low bid costs, 10 percent contingency of the contract costs, 5 <br />percent administration charges, short-term financing costs, bond anticipation notes (BANs), costs <br />,for Engineering services, and other charges associated with the project which are allowed in EC <br />7.175. The final assessment will be based on final contract costs, actual Engineering service <br />costs, actual short-term financing and BAN costs, a 5 percent finance administration cost, and <br />other direct costs attributable to the project. <br /> <br />Approximately $396,438.00 of the total assessable cost represents the share for properties <br />adjacent to Prairie Road not wishing to receive sewer service at this time. These properties have <br />been included in the computation of assessment unit costs. Approximately $360,128.00 of the <br />assessable cost will be borne by the City of Eugene. This cost represents cost associated with the <br />oversize pipe (greater than 8") and the prorated cost associated with the combined Prairie road, <br />Irving Road projects. <br /> <br />The cost to resurface Prairie Road will be distributed among the properties that can receive <br />service from this system. The cost will be broken into two components. Resurfacing cost <br />associated with the main line sewer trench will be part of the lateral cost. The resurfacing cost of <br />the service line trench will be part of the service cost. <br /> <br />In 1996, a portion of this sewer system was constructed as part of Lane County's improvement <br />project along Irving Road. Generally, properties along Irving Road from the Northwest <br />Expressway west to 1900 feet west of Prairie Road will be served by this portion of the system. <br />These properties where not assessed for this construction. Properties along Irving Road, that <br />have not requested to be included in the LID, will pay an 8-inch equivalent assessment as they <br />connect to the sanitary sewer. <br /> <br />The sewer along Irving Road is an integral part of the sewer system that will provide service to <br />this portion of Prairie Road (see attached Exhibit "H"). The assessable costs from the <br />construction of both the Prairie Road bid and the payments to lane County for the Irving Road <br />system construction are included in the calculation of the cost per square foot. 'This will provide <br />an equitable distribution of the costs over the entire area served by the Prairie Road sanitary <br />sewer system. <br /> <br />Page 4 <br />