My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4740
COE
>
City of Eugene
>
Resolutions
>
2002 No. 4697-4745
>
Resolution No. 4740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:24 PM
Creation date
7/13/2006 1:16:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
9/23/2002
Document_Number
4740
CMO_Effective_Date
9/23/2002
Repeal_Date
5/7/2007
Author
Kathleen A. Fieland
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
View images
View plain text
<br />TABLE 2 <br /> <br />Potential Impact Reduction and Credits for Systems Development Charges <br /> <br />NOTE: These are possible examples only; eligibility is established at time of review of <br />plans which approve the proposed improvements. <br /> <br />1. Transportation System <br /> <br />REDUCTIONS: <br />Successful bus pass program for employees <br /> <br />CREDITS: <br />Street width in excess of assessable width <br />Off-site, non-contiguous arterial or collector intersection <br />Street light on arterial or collector street <br />Off-site arterial or collector right of way and easement acquisition <br />Traffic signal on arterial or collector street <br />Off-street bicycle paths identified in adopted City plan <br />Off-site eligible public improvements where equivalent assessments can be collected <br /> <br />2. Wastewater System <br /> <br />CREDITS: <br />Public Wastewater collection lines> 8-inch diameter <br />Public pump stations and pressure lines that serve more than the development <br />Off-site public improvements, where equivalent assessments can be collected <br />Prior Payment of Metropolitan Wastewater Service District debt service <br /> <br />3. Stormwater System <br /> <br />REDUCTIONS: <br />Retention system (e.g. drywell, infiltration trench) <br /> <br />CREDITS: <br />Stormwater collection lines > 24-inches in diameter <br />Major drainage channels: construction and off-site easement <br />Off-site public improvements where equivalent assessments can be collected or that <br />benefit existing developments <br /> <br />4. Parks System <br /> <br />CREDITS: <br />Land dedication (for sites accepted by City, consistent with adopted City plans) <br />On-site park facility dedication (for improvements accepted by City, consistent with adopted <br />City plans) <br /> <br />City of Eugene SDC Methodology <br /> <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).