My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4740
COE
>
City of Eugene
>
Resolutions
>
2002 No. 4697-4745
>
Resolution No. 4740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:24 PM
Creation date
7/13/2006 1:16:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
9/23/2002
Document_Number
4740
CMO_Effective_Date
9/23/2002
Repeal_Date
5/7/2007
Author
Kathleen A. Fieland
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />existing system is available to meet the demands of new customers. Therefore, <br />the value of available (or growth-related) capacity in the existing system is $45.3 <br />million (net of grants). <br /> <br />Improvement Fee <br /> <br />Calculation of the improvement fee begins with a review of the utility's wastewater <br />master plan to determine which, or what portion of, improvements are needed to <br />provide capacity for new development. System capacity may be expanded <br />through the upgrade of existing facilities or the construction of new facilities. The <br />costs of the capacity-increasing improvements are projected based on standard <br />cost-estimating techniques. The planned capacity-increasing improvements are <br />projected to total $8.6 million (in 1998 dollars). These improvement costs are also <br />net of assessments. <br /> <br />Combined, the reimbursement fee cost basis and the improvement fee cost basis <br />represent the value of growth-related capacity, which is $53.9 million. <br /> <br />1.1.2 Step 2 - Define System Capacity <br /> <br />As mentioned previously, the total growth-related capacity includes available <br />capacity in the existing system, and future capacity added by planned system <br />improvements. Wastewater system capacity is measured in terms of the amount <br />of flow that can be collected. Flow is measured in millions of gallons per day <br />(mgd). <br /> <br />The City's Wastewater Master Plan identifies build-out capacity as 48.9 mgd. In <br />order to reach that capacity, the City must construct an additional $8.6 million of <br />improvements. Assuming that the unit cost of existing and future capacity is the <br />same (in terms of replacement value), then the existing capacity of the system can <br />be estimated as 44.5 mgd (in proportion to the system value that has been <br />constructed.) The available capacity of 23.1 mgd (52%)) is simply the difference <br />between the estimated existing capacity and existing flows. <br /> <br />The additional capacity added by the improvements is estimated to be 4.4 mgd <br />(the difference between build-out capacity and existing capacity.) Therefore, the <br />total growth-related capacity is 27.5 mgd. <br /> <br />1.1.3 Step 3 - Calculate Unit Cost of Growth-Related Capacity <br />(in 1998 dollars -- see current values in Table 6) <br /> <br />The unit cost of growth-related capacity is determined by dividing the growth- <br />related costs identified in Step 1, by the growth-related capacity defined in Step 2. <br />The unit cost is stated in terms of dollars per mgd. The total growth-related costs <br />are $53.9 and the growth-related capacity is 27.5 mgd. Therefore, the unit cost of <br />growth-related capacity is approximately $2 million per mgd. <br /> <br />1.1.4 Step 4 - Develop SDC Rate Schedule <br /> <br />The SDC rate schedule uses scaling measures that are designed with the intent <br />that customers who are larger, or use infrastructure systems more intensively, pay <br /> <br />City of Eugene SDC Methodology <br /> <br />Wastewater, Page C- 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.