Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />· Credits are required for "qualified public improvements." <br /> <br />This general approach is illustrated in Figure 1 and can be outlined in the following steps: <br /> <br />· Determine System Service Characteristics. <br /> <br />)'> System consists of several components (e.g., lines, pump stations, force mains, <br />manholes are components of the wastewater system). <br />)'> Establish impact measure - that feature of development that best reflects use of <br />system capacity (e.g., trips for the transportation system, impervious surface for <br />the stormwater system, etc.). <br /> <br />· Determine System Value, including associated costs such as design, construction, <br />right-of-way acquisition and project administration. <br /> <br />)'> Use replacement cost (current construction costs). <br /> <br />)'> Determine capacity-oriented cost of system, net of assessments and grants. <br /> <br />)'> Determine ratio of Improvement and Reimbursement portions of charge, if any. <br /> <br />· Allocate the system value to the unit of impact (e.g., cost per unit of impervious area <br />for stormwater system). <br /> <br />· Determine the service impact of specific development types (e.g., single-family dwelling, <br />motel, convenience market). <br /> <br />City of Eugene SDC Methodology <br /> <br />Page 4 <br />