My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4740 Amendments
COE
>
City of Eugene
>
Resolutions
>
2002 No. 4697-4745
>
Resolution No. 4740 Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:28 PM
Creation date
7/13/2006 1:35:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Number
4740 Amends
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix D <br />Stormwater System Charge Detail <br /> <br />1.0 Formula <br /> <br />The impact analysis for the stormwater system is based on square footage of impervious <br />surface, which creates an impact on the stormwater system by land use type. Impervious <br />surfa~e is defined in section 6,406 Eugene code, 1971 as "any hard surface area which causes <br />water to run off the surface in greater quantities or at an increased rate of flow from conditions <br />pre-existing to development. Common impervious surfaces include, but are not limited to, <br />rooftops, walkways, driveways, parking lots, or concrete or asphalt surfaces. n The estimated <br />non-assessable cost of the system-wide capacity from future capacity-enhancing projects, as <br />contained in the Stormwater SDC-Eligible Project List, and the estimated available capacity in <br />the existing stormwater system projected to be used by new development is used as the _basis <br />for determining the stormwater SDC. <br /> <br />The stormwater SDC is comprised of an improvement fee and a reimbursement fee, as new <br />development will require the construction of additional' system capacity as well as the use of <br />available capacity in the existing system, The per unit cost of additional capacity for the <br />improvement fee is based on the value of the system-wide capacity of future capacity- <br />enhancing projects (current planned projects are listed in the Stormwater SDC-Eligible Project <br />List, Table 13) divided by the total projected impervious surface area that will be added by new <br />development at build-out within the Urban Growth Boundary (UGB). The per unit cost of <br />existing capacity for the reimbursement fee is based on the value of available system-wide <br />capacity within the existing system projected to be used by new development divided by the <br />total projected impervious surface area that will be added by new development at build-out <br />within the UGB, <br /> <br />The value of the future stormwater system is based on the estimated .costs of planned future <br />capacity-enhancing stormwater projects contained within stormwater plans and the Capital <br />Improvement Plan (CIP). Of that total value, the SDC-eligible component is attributable to those <br />portions of future projects that are non-assessable and capacity-enhancing and related to the <br />demands of-future development; Le. add new capacity for new users. <br /> <br />The total value of the existing system is estimated based on the replacement cost of the <br />stormwater system components, which include both piped system and open channel system <br />components. Assessable costs are excluded from the SDC-eligible existing system costs. <br />Assessable costs are determined using the approach specified in the City Code, The city <br />assesses up to and including the first 24 inches of pipe diameter or equivalent capacity. The <br />non-assessable portion of stormwater system costs (SDC eligible costs) is based on <br />replacement costs minus assessable costs. The portion of non-assessable existing system <br />value allocated to new development (SDC-eligible value) is established by determining the <br />percent of piped system and open channel system capacity projected to be used by new <br />development. The use of capacity of the existing system is estimated with use of "hydraulic <br />modeling to identify existing available capacity (based on existing land use and flow data) and <br />expected future conditions (based on Metro Plan designations). <br />
The URL can be used to link to this page
Your browser does not support the video tag.