My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4740 Amendments
COE
>
City of Eugene
>
Resolutions
>
2002 No. 4697-4745
>
Resolution No. 4740 Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:28 PM
Creation date
7/13/2006 1:35:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Number
4740 Amends
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 8 <br /> <br /> <br />Design Percent of Component < Design Percent of <br />Capacity Facility Cost Value Capacity Facility Cost Component Value <br />49,000,000 22,0% $22,973,702 1,000,000 3.1% $202,500 <br />175,000,000 43,0% $44,903, ~45 16,500,000 96.6% $6,409,500 <br />66,000 19.0% $19,840,924 1,000 0,2% $11,250 <br />71,600 16.0% $16,708,147 1 ,420 0.2% $11,250 <br /> 100,0% $104,425,918 100,0% $6,634,500 <br /> <br />Cost of SS Component I Design SS daily capacity = Cost per pound ofSS per day <br />($16708,147 /7!J ,600) + $11,250/1,420) pounds per day = $241,27 per pound <br /> <br />* <br /> <br />The unit cost of Peak Flow is calculated on the basis of average daily plant capacity of 49,000,000 to enable recovery of costs from system users. <br />
The URL can be used to link to this page
Your browser does not support the video tag.