Laserfiche WebLink
<br />TABLE 1 <br />SUMMARY OF LOCAL SYSTEMS DEVELOPMENT CHARGES <br /> <br />(See Appendix C-2 for information regarding the Regional Wastewater SDC) <br /> <br /> Transportation Wastewater Local (City) Stormwater Parks <br /> Cost per Trip = $1,452.30 Cost per new residential units (e.g., Total stormwater unit cost per sq.ft. Cost per Dwelling Unit = <br /> single-family, mobile home parks, of impervious surface Area = $1,344.65 <br /> duplexes, apartments) = a base $0.158. Charges are based on use. <br /> rate of $317.32 plus $0.0769 per 1-2 Family development under <br /> square foot of living area. 3,000 sq.ft have tiered rates based <br /> Residential additions will be on est. imp. surface areas. 1-2 <br />III charged $0.0769 per square foot of Family over 3,000 sq.ft. and Multi- <br />S increased living area. Family & Nonresidential are based <br />l'CI <br />0:: Nonresidential uses = $2.4039 per on actual imp. surface area. <br /> gallon of daily flow/discharge. Charges for Mfg. Home Parks are <br /> based on est. imp. surface area <br /> per space plus actual impervious <br /> surface area of additional common <br /> area. <br /> Estimated costs of arterial/collector Estimated non-assessable cost of Estimated non-assessable cost of Unit costs for various components. <br /> Street system (non assessable existing system using costs from system-wide capacity from future <br />III cost per lane-mile, costs of "Gravity Sewer Lines System capacity-enhancing projects as <br />'jjj intersections, traffic signals, street Valuation Model" developed by contained in the Storm water SDC <br />l'CI lights, structures) and off street CH2M Hill. Charges are net of all Project List and available existing <br />lD <br />... bicycle paths. federal grants and outstanding stormwater system capacity. <br />III <br />0 debt. <br />u <br />III Existing levels of service for Design flow standards currently Design standards currently used by Existing levels of service for <br />'tl various components as established used by the city for various land the City to handle a Five-year various components, as <br />~ <br />l'CI by current City transportation use types. PFUs equivalents are storm. established in Eugene Parks & <br />'tl <br />c:: design standards. determined per Oregon adopted Recreation Plan. <br />S <br />en Plumbing Code. <br />QI <br />CJ <br />'~ <br />QI <br />en <br />c:: Street Component: Reimbursement fee Reimbursement fee Improvement fee <br />~ QI ~ 40% Impr. Fee ~ 84% ~ 47% <br />l'CI Cl ~ 60% Reim. Fee <br />CJ la <br />q::.c Bike Component: Improvement fee Improvement fee <br />"jjj U <br />11I_ ~ 100% Impr. Fee ~ 16% ~ 53% <br />l'CI 0 <br />[) <br /> Charges for new or expanding New or expanding residential uses Charges for new (all) or expanding Charges are based on a flat rate <br /> development are based on the cost are charged based on a per (Multi-family, Nonresidential) per dwelling unit for all types of <br /> per trip times the trip rate assigned dwelling unit cost plus a rate per . development are based on residential development. There is <br /> for a specific development type square foot of living area. Non- estimated or actual impervious no charge for commercial <br />c:: times the number of units of residential uses are charged based surface areas and the total development. <br />0 measurement proposed. on the number of PFUs at a rate stormwater unit cost per square <br />., <br />J9 for the specific development type. foot. Stormwater impact not <br />c:: Credit for past trunk sewer levy attributable to impervious surface <br />QI <br />E payments will be applied to the area will be charged based on <br />QI <br />Q. local charge. equivalent surface area and the <br />.E total stormwater unit cost per <br /> square foot. <br />Note: Administration costs are not included in the fiQures above, see section 2.3.1 for more information. <br />