Laserfiche WebLink
<br />)> Sum these amounts, to derive a total cost per FEU for a specific type of development; <br /> <br />)> Multiply the total cost per FEU for a development type by the number of FEUs for a <br />development application. <br /> <br />For more detailed and specific numerical data on FEU calculations, see Table 8. For <br />formula illustrations, see Figure 5 in this Appendix. <br /> <br />2.2.1 MWMC Process Wastewater <br /> <br />The MWMC wastewater SDC for development that discharges process wastewater to <br />the wastewater system will be charged on the basis of the strength of that discharge. <br />The rates per FEU for land uses listed in Table 10 include process wastewater <br />charges. For uses not otherwise listed in Table 10 that include process wastewater, <br />the MWMC SDC will be calculated by combining the charge for unit of development <br />for general industrial uses, and adding the charge for the process wastewater FEU <br />that matches the strength of the proposed discharge. The strength classes shown in <br />10 are the same strength classes used by MWMC in the user fee system. <br /> <br />City of Eugene SDC Methodology <br /> <br />Revised Feb-3-03 Wastewater, Page C- 8 <br />