My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Joint Meeting with Eugene Planning Commission
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 07/17/06 Work Session
>
Item A: Joint Meeting with Eugene Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:03:02 PM
Creation date
7/13/2006 2:17:51 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OPPORTUNITY SITING <br /> Time Needed <br />Options: Required Resources <br /> <br />1: Study only City-owned and school district properties. 6 months .25 FTE <br /> (examples: downtown sites, housing land bank, old school sites) <br /> <br />2: Study all publicly-owned properties and properties that could be 9 mo. .5 FTE <br /> easily obtained by City. <br /> (examples: #1, above, surplus government properties, large lots) <br /> <br />3: Private properties. (select a few as examples, plus #1 +2, above) 9 mo. - ongoing 1.0FTE+$30,000/yr <br /> <br />4: Develop criteria, then identify and study all sites within the 9 mo. – ongoing 2.0 FTE+$75,000/yr <br /> UGB, studying approximately 3 sites at a time. <br /> <br />5. New Process (to be done independently of Options 1-4, above): 1 year .25 FTE to create; ongoing <br /> Create new process where opportunity sites are identified by costs for neighborhood <br /> private sector, reviewed and analyzed by neighborhood org., and consultant pool <br /> approved by Planning Commission. (est: $10-50,000/yr) <br /> <br /> <br />Supporting Studies: <br /> <br /> <br /> <br />1.Explanation of high density and mixed use financial First 6 months $50,000 <br />considerations; recommendations for best site traits for <br />opportunity sites. <br /> <br /> <br />2.Feasibility analysis of specific selected sites; provide On-going $10-20,000/site <br />recommendations for highest and best uses at current time and <br />near future. <br /> <br /> <br /> <br /> <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.