Laserfiche WebLink
Roosevelt Middle School_Hanni_Bg <br />In~ar~y 2004, the Sch~~~ District began a public process of their own to look at <br /> ives for lng Roosevelt Middle SChooL This process was initiated based on <br />the in the next ten years, and the <br />desire park_ Two punic <br /> the school werediscussed. <br /> <br />-were narrowed to those which are on school district property, and will not directly <br />impact park land. See the appendix for potential building location diagrams. Following the <br />c°nclusion of the school district public process, the 3;a Workshop fbr Amazon parl~ was <br /> <br />Workshop_~ <br />On May 25, 2004 the 3ra and final Amazon Park Planrdng Workshop was held at <br />Amazon Co Center~ The event was anopen house and tour of the park. <br />Approximately 50 individuals participated in the event. Two graphics were on display <br />in ~he commun~(y center; one s~how~g the cOmplete <br /> <br />bond measure dollars. <br /> <br />FOur stations were set up in the park to provide <br />further information on the improvernents which were <br />identified for funding. The stations were staffed by <br />Parks and Open Space Division and Recreation <br />DiVision stMf, tour guide Was provided <br />to parti ~ <br /> <br />park, the newbridge c~ossing location, the renovated <br />ballfield and new path locations, and the new restroom <br />location. <br /> <br />Workshcrp #3 open house. <br /> <br /> place aflag in Mocation <br />the event, the locations were <br /> <br />tour guide, and results from a questionnaire distributed at the workshop. <br /> <br />Amazon Park Concept Design Page lO February 15, 2005 <br /> <br /> <br />