My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-05-02
COE
>
City of Eugene
>
Administrative Orders
>
2005
>
Admin Order 58-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:49:06 AM
Creation date
3/24/2005 4:18:19 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/1/2005
Document_Number
58-05-02
CMO_Effective_Date
3/1/2005
Author
Kurt Corey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />~ay ~5~ 2004 <br /> <br />The 3rd and final workshop for the Amazon Park p~ann~n9 process was held on Tuesday, May <br />25th at the AmaZon community Center. The Purpbse of {~ event was to Share the dra~ <br />conCept design and prioritized improvement pia~ w~th the public, and a~low additional input on <br />the pr0posal~. <br /> <br />An open house format allowed paAicipants to review the proposals and take a self-guided tour <br />thr°~gh the park of the proposed improvements. Approximately 50 individuals pa~iCipated in <br />the e~ent. T~© different plans were Bispiayed: <br />~ the Concept Design ~or the park, s~°~ ng overall goals and improvements for the park, and <br /> the Pdodt~ Impro~ement Pi~n, Which [de~tifies projects that ar~ earmarked for av~i~abie <br /> fUnding. <br /> <br />Comments o~ both these plans were accepted through June 21st, 2004. A~so on d~splay was a <br />model of the 'zig zag bridge" which is a 1% for aA piece which will be installed as a c~os~in9 <br />over Amazon Creek. <br /> <br /> which <br /> <br /> st: <br /> <br />ave been prioritized for available funding. <br /> <br />Adidas Trail <br />buffer <br /> <br /> path <br /> <br />Additional priority improvements inclUde: shielding the existing tennis court lights to reduce <br />Care, and installing & signalized crossing and intersection at ~6th and Hilyar(~ by year 2006. <br /> <br />Participants were also invited to fil~ out a questionnaire and place a flag in a location where they <br />desire~ a place for sitting, At the end of the event, the locations were recorded. <br /> <br />Amazon Park 07/20/04 <br />WOrkshop 3 Report Page I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.