Laserfiche WebLink
Histo_o~ <br /> <br /> · was initially acquired in 1947 through the Century Progress Fund. <br /> <br /> ora <br />ballfield and the swimming pool opening. The creek was &amafically modified by the <br />Army Corp of Engineers in 1958 -when it was enlarged, str and partially lined <br />with concrete. <br /> <br />The 1960's and 1970's playground, <br />tenniscourts, Amazon <br />constructed. In 1974, Amazon Parkway was extended between 24a~ and 30th Avenue. In <br />'the late 1980% the playground was remodeled, the Hilyard Community Center was <br />opened and the softball/soccer field was constructed south of 24th. In the 1990% the <br /> (one of the first of its kind) and the dog park was installe& <br /> <br />~' development and identify <br /> <br /> a <br /> <br />Amazon Park master plan, t994. <br /> <br /> to Amazon Park. The Bond Measure <br /> Park,'2- <br />lighted baltfields with parking." This recommendation was only partially consistent <br />with the 1994 master plan, which designated an area for two ballfieid s, but did not <br />identify additionaI paved parking. <br /> <br />Amazon Park Concepf Design Page 5 February 15, 2005 <br /> <br /> <br />