Laserfiche WebLink
<br />I ::xHISIT --L .. <br /> <br />FINDINGS AND RECOMMENDATINS <br /> <br />SUBJECT: SANTA CLARA SANITARY SEWER PROJECT 1996 BASINS S, X, and <br />U; FORMATION OF THE LOCAL IMPROVEMENT DISTRICT FOR <br />JOBS 2928, 3013, AND 3398 <br /> <br />BACKGROUND <br /> <br />The City of Eugene has identified the 1996 Santa Clara Sanitary Sewer project as a project <br />necessary to address an important health and welfare issue within the metropolitan area. The <br />project conforms to the Metropolitan Area General Plan requirements and stipulations of the <br />Environmental Protection Agency (EPA) grant conditions which include service delivery targets. <br />The 1996 project represents the seventh year of a seven-year program to service the River Road- <br />Santa Clara area. <br /> <br />On November 20, 1989, the City Council amended the Eugene Capital Improvement Plan (CIP) <br />by modifying the timing for service delivery to the River Road/Santa Clara Area. Following that <br />amendment, the City Council authorized the City Engineer to proceed with the phased prepara- <br />tion of plans and specifications for the improvement and to call for bids each year of the <br />program. On March 5, 1996, the seventh consecutive year's construction projects were <br />advertised in the legal section of The Register-Guard and in the Daily Journal of Commerce. <br /> <br />To comply with the EPA grant connection schedule condition, to maximize competitive bidding <br />and administrative efficiency, and to minimize as much as possible the disruption to the <br />neighborhoods, the River Road and Santa Clara areas were divided into a number of construction <br />basins. Each year since 1990, sewers have been installed in several basins. In 1996, sewers are <br />scheduled to be installed in three basins in Santa Clara. <br /> <br />Basin 96S(Job 2928) generally includes properties between River Road and Beaver Street and <br />Division Avenue and Salty Way. Basin 96U (Job 3013) is described as generally properties <br />between Federal Lane and Blackfoot Avenue and River Road and Marvin Drive. Basin 96X (Job <br />3398) is described as the properties between Irving Road on the South and Cinnamon A venue on <br />the north and Stark Street on the east and Northwest Expressway on the west. <br /> <br />Several bidders submitted bids for the 1996 construction. Four (4) bidders submitted bids for <br />Basin 96S on April 23, 1996. The low bid was submitted by Eugene Sand & Gravel Inc. for <br />$1,558,315.00. Five (5) bidders submitted bids for Basin 96U on April 24,1996 The low bid <br />was submitted by Dan D Allsup Contractor for $1,173,996.00. Three (3) bidders submitted bids <br />for Basin 96X on April 25, 1996 The low bid was submitted by Eugene Sand & Gravel Inc. for <br />$289,489.00. The total of all three (3) bids is $3,021,800.00, which is approximately nine <br />percent below the Engineer's estimate for the 1996 work. <br /> <br />SANTA CLARA SEWER BASINS "S" "X" AND "U" <br />Findings and Recommendations - Jobs 2928, 3010 and 3398 <br /> <br />Page 1 <br />