My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2017 City Council Agenda
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2017
>
03-13-2017
>
03/13/2017 City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:26:29 AM
Creation date
3/10/2017 9:18:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/13/2017
CMO_Effective_Date
3/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 Report to the Citizen Street Repair <br />Review Panel <br />TABLE OF CONTENTS <br />INTRODUCTION.............................................................................................................1 <br />CRITERIA FOR PROJECT SELECTION AND SCHEDULING ...................................... 3 <br />FUNDING STATUS AND FORECAST...........................................................................7 <br />5TH AVENUE, 6TH AVENUE, 7TH AVENUE, AND COMMERCIAL STREET...................9 <br />FAIRFIELD AVENUE AND JACOBS DRIVE...............................................................10 <br />8TH AVENUE, LINCOLN STREET, AND WASHINGTON STREET..............................11 <br />27TH AVE, CAPITAL DR, POTTER ST, SPRING BLVD, AND VAN NESS ST ............ 12 <br />CENTENNIAL LOOP....................................................................................................13 <br />WILLAMETTE STREET................................................................................................14 <br />2016 PEDESTRIAN AND BICYCLE IMPROVEMENT PROJECTS .............................15 <br />APPENDIX A (BOND PROJECT COSTS AND FORECAST, BY YEAR) ....................16 <br />APPENDIX B (MAP OF BOND PROJECTS, BY NUMBER)........................................18 <br />APPENDIX C (PROJECTS FOR PEOPLE WHO WALK AND BIKE) .......................... 21 <br />APPENDIX D (REPORT OF THE INDEPENDENT AUDITOR) .................................... 26 <br />Photos on cover from 2016 projects: Completed paving on 27th Avenue (left); Sign Installation <br />on River Road (upper right); Completed paving on Spring Blvd (lower right) <br />0 16 'ioif fofJ�r �''age I <br />
The URL can be used to link to this page
Your browser does not support the video tag.