Laserfiche WebLink
2016 Bond Construction Projects <br />The following pages are reports on individual projects. The total costs for each project listed are <br />estimated as not all of the 2016 construction -related costs have been finalized as of January 1, <br />2017. <br />Completed Paving on Fairfield Ave at Fairfield Elementary School <br />20 16 ,,ioil: fo fJ l i, S iage 8 <br />