My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2017 City Council Agenda
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2017
>
03-13-2017
>
03/13/2017 City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:26:29 AM
Creation date
3/10/2017 9:18:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/13/2017
CMO_Effective_Date
3/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Willamette Street <br />Project Description: This project consisted of rehabilitation of this street in the Downtown <br />Neighborhood Association neighborhood in Council Ward 1: <br />• Willamette Street from 13th Avenue to 10th Avenue <br />Treatment Methodology: <br />• Willamette Street was reconstructed by removing the existing pavement, building an 18 <br />inch aggregate working platform wrapped in subgrade geotextile fabric, and repaving with <br />11 inches of asphalt. <br />Costs: Total project costs, from all funding sources, are estimated at $580,000. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $613,000 <br />Total Projected/Actual Bond Funds Used = $434,000 <br />Difference = $179,000 <br />The total amount of bond funds used for bicycle and pedestrian improvements on this project <br />were approximately $71,000. <br />Additional Sources of Funding: Stormwater utility funds, LTD funds and private funds from the <br />Capstone development. <br />Project Photo: <br />Completed Paving Willamette Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.