My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2017 City Council Agenda
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2017
>
03-13-2017
>
03/13/2017 City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:26:29 AM
Creation date
3/10/2017 9:18:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
3/13/2017
CMO_Effective_Date
3/13/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 Pedestrian and Bicycle Improvement Projects <br />Project Description: In addition to the pedestrian and bicycle improvements incorporated into <br />the paving projects described above, pedestrian and bicycle improvements were constructed at <br />four locations for $682,500: <br />• Install sidewalk ramps, median and rectangular rapid flashing beacon on River Rd. <br />• Install sidewalk ramps, median and rectangular rapid flashing beacon on Division Ave. <br />• Install sidewalk ramps and sidewalk on Goodpasture Island Rd. <br />• Install school zone signage and striping on 30th Ave and University St. <br />See the Memo in Appendix C for additional projects that included bond funds for pedestrian and <br />bicycling improvements. <br />Pedestrian and Bicycle Improvements Funded in 2016: The 2012 bond measure allocated a <br />total of $2,580,000 for pedestrian and bicycle improvements. The average total amount per year <br />is $516,000 over the five year bond. Over the last three years, this project and expenditures on <br />all pedestrian and bicycle improvements funded by the bond have totaled $2,033,200. The <br />remaining available funds for pedestrian and bicycle improvements are $546,800 for 2017 - 2018. <br />Project Photos: <br />Goodpasture Island Rd Sidewalk Infill River Road RRFB <br />20 16 ,:ioil fofJCr S �� g' ' .15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.