Laserfiche WebLink
APPENDIX A <br />2014 Report from Engineering to the Citizens Street Repair Review Panel <br />5 -Year Street Bond Proiect List - Costs and Forecast <br />Project <br />Map # <br />Street name <br />From <br />To <br />Ward(s) <br />Proposed Treatment <br />Programmed <br />Cost (2012) <br />plus inflation <br />projected/ <br />Actual Cost Difference <br />17/18 <br />30th Avenue L <br />Willamette Street <br />Ferry Street <br />2 <br />Reconstruct <br />$ 437,000 <br />$ <br />26 <br />Buff Way L <br />Woodside Dr <br />Forrester Wy <br />4 <br />Reconstruct <br />$ 179,000 <br />$ <br />29 <br />Carmel Avenue L <br />MindaDr <br />400'south <br />5 <br />Reconstruct <br />$ 132,000 <br />$ <br />35 <br />Corydon Street L <br />Forrester Wy <br />Tandy Turn <br />4 <br />Reconstruct <br />$ 41,000 <br />$ <br />41 <br />Forrester Way (L) <br />Coburg Rd <br />west side of <br />driveway 1033 <br />4 <br />Reconstruct <br />$ 248,000 <br />$ <br />50 <br />Larkspur Avenue L <br />Norkenzie Rd <br />604'west <br />5 <br />Reconstruct <br />$ 211,000 <br />$ <br />51 <br />Larkspur Loo L <br />Norkenzie Rd <br />5 <br />Reconstruct <br />$ 171,000 <br />$ <br />57 <br />Mill Street L <br />30th Avenue <br />2 <br />Reconstruct <br />$ 49,000 <br />$ <br />61 <br />Piper Lane L <br />Chasa St <br />Fir Acres Dr <br />5 <br />Reconstruct <br />$ 196,000 <br />$ <br />63 <br />Roland Way L <br />Oakway Rd <br />Cal Young Rd <br />5 <br />Reconstruct <br />$ 216,000 <br />$ <br />65 <br />Sharon Way (L) <br />Coburg Rd <br />east side of driveway <br />1023 <br />4 <br />Reconstruct <br />$ 376,000 <br />$ <br />69 <br />Tulip Street L <br />Crescent Ave <br />Holly Ave <br />5 <br />Reconstruct <br />$ 118,000 <br />$ <br />72 <br />West Amazon Drive (A) <br />Hilyard St <br />Fox Hollow Rd <br />2 <br />Reconstruct <br />$ 1,463,000 <br />$ <br />74 <br />Willamette Street A <br />24th Ave <br />129th Ave <br />1,2 <br />1 Reconstruct <br />$ 1,232,000 <br />$ <br />76 <br />Woodside Drive L <br />Cal Young Rd <br />ISharon Wy <br />4 <br />1 Reconstruct <br />$ 423,000 <br />$ <br />tx/ street uiassmcation Key: tL/ = Locar, (u) = construction Year zuls iotais = y s,uuu,uuu y y <br />Collector; (A) = Arterial <br />Total Programmed Costs = $ 40,290,000 $ 18,357,000 $ 21,933,000 <br />Padactrian and Rir_vr_la Imnrnvamantc Prniar_t I i --,t <br />GnnSrrllrrinn rear Yma <br />2014 Pedestrian & Bicycle Repairs <br />$ <br />Average <br />Acorn Park Sidewalks <br />$ <br />128,000 <br />1st, Madison, Monroe <br />Annual <br />Projected/ <br />13th Avenue (Washington to Garfield) <br />Projects <br />25,000 <br />Goodpasture Island Loop Pedestrian Signals <br />$ <br />Difference <br />Roosevelt Blvd Pedestrian Signals and Sidewalk Infill <br />$ <br />Allocation <br />Actual Cost <br />Construction Year 2014 Pedestrian & Bicycle Repairs Total = $ <br />742,000 1 $ 226,000 <br />Tu man Brid e and Sidewalk Improvements <br />$516,000 <br />12,500 <br />GnnSrrllrrinn rear Yma <br />2014 Pedestrian & Bicycle Repairs <br />$ <br />410,000 <br />Acorn Park Sidewalks <br />$ <br />128,000 <br />1st, Madison, Monroe <br />$ <br />92,000 <br />13th Avenue (Washington to Garfield) <br />$ <br />25,000 <br />Goodpasture Island Loop Pedestrian Signals <br />$ <br />29,000 <br />Roosevelt Blvd Pedestrian Signals and Sidewalk Infill <br />$ <br />58,000 <br />South Willamette Street Improvements$ <br />Construction Year 2014 Pedestrian & Bicycle Repairs Total = $ <br />742,000 1 $ 226,000 <br />rnnctn irtinn Vear 9015 <br />2015 Pedestrian & Bicycle Improvement Project <br />$ <br />349,000 <br />15th and 17th Avenues Markings <br />$ <br />38,000 <br />Fillmore and Friendly Streets Markings <br />$ <br />10,000 <br />Donald Street Crossing <br />$ <br />19,000 <br />Garden Way and Willakenzie Markings <br />$ <br />20,000 <br />Valley River Way Pedestrian Signal Upgrades <br />$ <br />20,000 <br />South Willamette Street Improvements$ <br />12,700 <br />Tu man Brid e and Sidewalk Improvements <br />$ <br />12,500 <br />Construction Year 2015 Pedestrian & Bicycle Repairs Total = $ <br />481,200 $ 34 800 <br />Cnnstrurtinn Year 2016 <br />2016 Pedestrian & Bicycle Improvement Project <br />$ <br />683,000 <br />Fairfield Avenue Sidewalk Infill <br />$ <br />44,000 <br />Willamette Street Markings & Sidewalk Improvements <br />$ <br />71,000 <br />Lincoln Avenue Bike Buffer <br />$ <br />12,000 <br />Construction Year 2016 Pedestrian & Bicycle Repairs Total = $ <br />810,000 $ 294,000 <br />Construction Years 2016 - 2018 $ 546,800 <br />Total Pedestrian and Bicycle Improvement Project Costs = $ 2,580,000 $ 2,033,200 $ 546,800 <br />Summary of Bond Costs <br />Total Street Projects in 2012 Dollars with inflation = $ 40,290,000 <br />Total Pedestrian & Bicyclist Improvements = $ 2,580,000 <br />Bond Issuance Costs= $ 130,000 <br />Total Bond Costs= $ 43,000,000 <br />