Laserfiche WebLink
Reclaimed Asphalt Pavement (RAP): The term given to removed and/or reprocessed <br />pavement materials containing asphalt and aggregates. These materials are generated when <br />asphalt pavements are removed for reconstruction, resurfacing, or to obtain access to buried <br />utilities. When properly crushed and screened, RAP consists of high-quality, well -graded <br />aggregates coated by asphalt cement that can be reused as a substitute for a portion of virgin <br />materials in asphalt and aggregate base. <br />Recycled Asphalt Shingles (RAS): A primary reason for the high potential value of recycled <br />shingles is that they contain ingredients that hot mix asphalt (HMA) producers purchase to <br />enhance their paving mixtures including asphalt cement (or AC "binder") and mineral aggregate. <br />Asphalt shingles also contain a fibrous mat made from organic felt (cellulose) or fiberglass that <br />can also be valuable as fiber in some asphalt paving mixes. <br />Current Treatment Costs <br />This chart provides detail of the current cost for treatment of the entire improved system <br />excluding concrete streets at the end of the 2016 rating period. The total estimated treatment cost <br />backlog at the end of 2016 is $92 million up from $79 million reported in 2015. <br />Treatment Costs By Functional Class 2016 Year End <br />$100,000,000 <br />$80,000,000 <br />$60,000,000 <br />$40,000,000 <br />$20,000,000 <br />$0 <br />................................................................................................................................................................................................................................................................................................................................................................................................................................................................ <br />Major Art <br />Minor Art <br />Coll <br />Neigh. Coll <br />Local <br />Total <br />a Slurry <br />$0 <br />$0 <br />$0 <br />$0 <br />$8,902,000 <br />$8,902,000 <br />................................................................................................................................................................................................................................................................................................................................................................................................................................................................ <br />mu Overlay <br />$2,264,000 <br />$5,846,000 <br />$369,000 <br />$1,477,000 <br />$35,149,000 <br />$45,105,000 <br />13 Reconst <br />$7,834,000 <br />$11,526,000 <br />$8,675,000 <br />$572,000 <br />$9,414,000 <br />$38,021,000 <br />.Totaj <br />$10,098,000 <br />1 $17,372,000 <br />1 $9,044,000 <br />,0490005346500092028000 <br />$2,049,000 <br />$53,465,000 <br />1 $92,028,00 <br />16 <br />