Laserfiche WebLink
<br />Exhibit C <br />Ordinance No. PA 1238 <br />Metro Plan Amendment and Rezone <br />Delta Property Company <br /> <br />Conditions Necessary to Minimize Conflicts are Required to Become Part of Any <br />Operation Plan Reviewed or Approved under LC 16.217 <br />______________________________________________________________________ <br /> <br />NOISE mitigation <br /> <br />All Zones: <br /> <br />1. Begin first and second lift mining operations no earlier than 7:00AM and end <br />mining operations no later than 10PM. <br /> <br />2. Retain the administrative controls of restricting the location of mining equipment <br />to reduce mining noise. <br /> <br />3. Take advantage of the screening effect provided when the equipment is below <br />grade. <br /> <br />4. First and second lift mining operations may be conducted separately or <br />simultaneously. <br /> <br />Zone 1 <br />5. No additional restrictions beyond adhering to the time limit above, conduct <br />normal mining procedures for all three lifts. <br /> <br />Zone 2 <br />6. Excavator removes a second lift of 18’ of material by digging from the base of the <br />second lift (digging from below) when the excavator is within 800’ of the western <br />boundary of the Expansion Area. <br /> <br />7. If the front end loader is operating at the same time as the excavator, the <br />excavator must be 1500’ or more away from any point on the western boundary <br />of the Expansion Area that is within 800’ of the front end loader. <br /> <br />Zone 3 <br />Same restrictions as Zone 2 plus the following additional controls: <br /> <br />8. After overburden is removed, the front end loader removes a first lift of 13’ of <br />material by digging from the base of the first lift when the front end loader is <br />within 550’ of the western boundary of the Expansion area. <br /> <br />Ordinance No. PA 1238 – Exhibit C Conditions Delta Sand & Gravel <br />Page 1 <br /> <br />